This plan on January 21 carries out since 2005, namely begins to understand this city air quality improvement maintenance plans each sub-plan work goal, the content and carries out the achievement, appraised carries out the result, after and further examines makes the suggestion. Because must grasp this city air source of pollution characteristic and the origin, this plan more widespread collection this city meteorological data and various sources of pollution discharge the detailed list, pushes estimates analyzes this city source of pollution to discharge the characteristic. Plan execution period in order to grasp each plan to carry out the progress, achieves the environmental protection bureau examination and critique goal, then the assistance environmental protection bureau convenes the work self-criticism conference way, can hit invites to be responsible for this city smear committee member to visit the instruction spatially, and aims at each plan to carry on carries out tracing self-criticism the result. This is as follows the achievement explanation:
First- Work present key
Stipulation according to the contract, this plan must carry out the latter two months in the plan to analyze this city each kind to discharge the source pollution structure, the self-criticism feasible decrement mechanism and examines the near long distance control strategy. In order to conform to stipulation the contract, this plan started to carry out besides the execution correlation formerly the work, Other work key then emphatically collection of and analysis in the material. But draws up “this city in 2005 version air pollution to guard against the system plan book”, has submitted the environmental protection bureau examination in at the end of March, and carries on the revision in the beginning of June according to the environmental protection bureau examination opinion, the environmental protection bureau and passed in 94.9.16 after the environmental protection bureau checking.
Second- spatial material analysis
This year Chiayi survey station not good date number altogether on 21st, this year not good date number 2002,2003 same times on 2nd, on 8th for high,2004 on 16th for low, in PM10 density aspect 2005 annual mean densities for 87μg/Nm3, 2004 same time 82.1μg/Nm3 high many, but are also low the ozone aspect density 24.2ppb 2002 to 2004, the obvious this year this city air quality O3 density has compared all previous years improvement.
Third- each sub-plan carries out the achievement discussion
1. fixed source of pollution control plan carries out the result self-criticism
After in order to achieve in 2005 environmental protection bureau examination and critique to request this plan to be supposed to continue the information bank to construct the files QA/QC, and the close attention environmental protection bureau control of result in view of the information bank, according to revises again completes supplements and corrects, achieves the information bank quality standard. Other should strengthen the tube to control the project suggestion to be as follows:
(1) Because on flaw of the semi-annual information bank, this year carries on patching, only can strengthen renewal work result the present stage, carries on the revision to achieve turnover rate of limitedly the withdrawal (%), in under stage suggested carries on the renewal in view of the this city level of contamination first ten big fixed sources of pollution, enables can cause this work result large promotion.
(2) Strengthens control the place characteristic like to affect this city state one's case the biggest food and beverage industry, strengthens the control. Next the Chiayi entire month temple fair greatly breaks off a relationship in view of every year lunar calendar in July, to carry on counselling to assist to impel various temples not open-air burning gold paper.
(3) This year examination and critique key checking of for the laws and regulations degree of conformity, checks when by scene primarily, therefore the scene checks must carry out, and requests the entrepreneur to depend on the permission content to carry on the operation truly.
2. builds the work site control plan to carry out the result self-criticism open-air burning case examination and the impetus air quality not good time grass non-open-air burning processing plan carries out the result self-criticism
In order to cause the non-open-air guidance to reach highest effect this year closes in the rice when to carry on the first large-scale guidance, and one after another will from now on carry on the following 13 in guidance meeting in the time. 2005 first half of the year key check for the generality does an inspection and assists to appeal case processing and the correlation data collection, latter half section with emphasis for guidance meeting. This plan progress conforms to the contract requirement. Next fiscal year this plan must pay attention key as follows:
(1) Continually increases the spatial not good season open-air burning examination to accuse the number.
(2) Strengthens nearby the survey station and the highway and the hawk plan passes through and so on the fields of vision to be possible and the area checks does an inspection.
3. Air pollution appeal processing plan control achievement self-investigation
Should plan in 2005 working volumes to achieve all surpasses the contract request, is carrying out the quality to have to pay attention as follows:
(1) Strengthens the appeal degree of satisfaction the investigation.
(2) The investigation appealed the process time, presents the appeal processing achievements.
4. Motion pollution control result self-criticism
(1) Motion source of pollution
Is as for the whole, execution this plan still called good, only this year environmental protection bureau execution key checked for the laws and regulations degree of conformity, therefore in the examination and critique target part, the examination work carried out the quality, the regular inspection station quality control and degree of satisfaction of the motion source of pollution air pollution improvement must pay attention specially, therefore should strengthen pays attention to each work to carry out checking of the quality. The regular inspection stands the management handbook and QA/QC standard work flow must carry out.
(2) Diesel car power gauge discharges fume the examination and the oil quality examination plan
According to the EVERPAR company proposed the report works the showing quantification goal mostly to conform to the progress; only the diesel car power gauge test number is backward, although in finally catches up with the progress. Next range estimate sentences picture of resolution the smoke suitably to strengthen again, avoids creating the vehicle owner to dispute. Should have to pay attention in the environmental protection bureau examination and critique target revised part of the examination and critique content, and avoids therefore misleads direction of the execution to cause the actual examination and critique score to be low.
5. Streets wash sweep the work
Raises work quantity achievement the newspaper according to the Champion company to demonstrate that, has been able to conform to the contract quantity, (detailed table 4.2.7-1) was only carrying out the work quality side still to be supposed to pay attention to the following several points:
(1) Washes the street appropriate to the occasion to plan the non-crowded stopped time as far as possible, carries out washes the street effect.
(2) Regarding washes sweeps the road section achievements please specifically to grasp, also its route and the frequency have the mobile adjustment mechanism suitably.
(3) Should pay attention to achievements of target the correlation, for example: Each kilometer water consumption and establishment road classification system…And so on.