To the central content area

Air quality improvement maintenance plan of Jiayi city for 97 year air pollution at night state one's case the case to process the plan

Absrtact
A summary The annual plan of operations to be carried out through December 31, for a total and complete petition admissible cases were protracted inspections and to assist in verifying the 1090 inspections 674, for a total of 1764 to reach this year's target of 176.4% (1764/1000). Petition in which the case falls within the categories of air pollution for 562 cases, accounting for 51.6% (562/1090), the implementation of results such as Table 1, the description is as follows: 1. the public petition on the admissibility of the case inspection delay Verifying the petition and inspect all a total of 1090 cases, including air pollution (no smell) 6, 188 open burning, air pollution (odor) 332, Construction Engineering 36, 470 cases of noise, water pollution 3 , sanitation 55. Noise in the number of cases in which the top, the total number of petition cases 43.1%, followed by air pollution (odor) petition cases accounted for 30.5%. Statistics of the admissibility of petition cases to petition the scene needed to spend time on average 16.96 minutes, with open burning petition received an average arrived at the scene for the fastest time 15.60 minutes, air pollution (odor) followed by an average of 15.80 minutes, noise petition an average of 16.80 minutes for the third place, air pollution (no smell) 17.50 minutes for the fourth, the construction works an average of 19.10 minutes for the fifth. Statistics petition accepted all types of cases to arrive at the scene to complete the necessary treatment time on average 25.07 minutes, with noise the average processing time is the fastest 22.35 minutes, depending on continued to air pollution (smell) The average processing time is 23.77 minutes, construction works the average processing time for petition 24.00 minutes, open burning petition the average processing time 24.39 minutes, air pollution (excluding stench) the average processing time is 30.83 minutes. In addition the basis of the "Executive Yuan's Environmental Protection pollution petition system" satisfaction survey poll in the table below, petition the city to complete its investigation of cases total 188, expressed "satisfaction" in those of 58, accounting for 45.31 percent, followed by "can be From "34 dollars, accounting for 26.56%. Analysis and Comparison of aggregate analysis of 95 years, 96 years and 97 years in response to satisfaction, very satisfied with the proportion of persons of 97 years reached 50.78%, representing a 95-year 39.92 percent raise over 96 years 28.16 percent raise. Second, analysis of petition cases 2. Analysis of petition cases a. Oven smell petition Statistical analysis of air pollution (odor) 332 petition cases in order to fume odor for up to a total of 144, accounting for 43.37 percent, followed by 62 not found, accounting for 18.67 percent, ranking third for livestock odor 41, accounted for 12.35%. To air pollution (odor) to petition a case which had occurred classification, with its principal business location, for a total of 109, accounting for 32.83 percent, followed by 47 vendors, accounting for 14.16 percent, ranking third for the unknown 44, accounting for 13.25 %. Plans to deal with the noise of the petition of 470 cases to the occurrence of the noise source categories, to a maximum of noise amplification facilities, including 120, accounting for 25.53 percent, followed by karaoke OK noise, of 90, accounting for 19.15%, as well as air-conditioning cooling towers, pumping motor noise cases, of 50, accounting for 10.64%. Location happened to the noise statistics, mainly happened at its principal place of business, for a total of 216, accounting for 45.96 percent, followed by homes of 98, accounting for 20.85 percent, ranking third for the temples or altars 26, accounting for 5.53 %. b. Open burning petition Analysis of the program accepted 188 cases of open burning, the open burning took place in the open space for up to a total of 58, accounting for 30.85 percent, followed by unknown, of 34, accounting for 18.09 percent, ranking third for the farmland of 26 accounted for 13.83%. To the type of burning material for further analysis did not find the main types of open burning for a total of 56, accounting for 29.79 percent, followed by the burning of waste leaf branches accounted for 41 to 21.81 percent, ranking third for the paper money 25, accounting for 13.30%. 3. Assist in verifying the inspection control operation This program to assist all types of cases protracted inspections 674 screenings, including stationary sources 87 shows the general inspector, inspectors general open burning of 56 matches, the focus of open burning 256 games inspections, general inspections of 144 matches noise, construction engineering inspector general 5 screening, noise tracking petition to review 20 matches, air pollution (odor) petition shows 76 track review, sanitation follow-up petition to review the case 29 times, air pollution (no smell) 1 review petition tracking shows, the commanding height of observation of 86 matches. 4. Verifying the results of inspections to improve a. Open burning focus inspections and general Protracted inspections According to the plan drawn up by open burning 20 key areas, with the exception of thick cow River inspectors have found that open burning cases and self-re-zoning - big expensive way to Tai Fu Tai Street Road to Daren Qiaodong Huaxing Street and South Bank etc. inspectors found stacking waste, the other 17 sites found that none of the pollution situation, and the inspection found stacking Waste Department has been requested to clean teams to help clean up. b. The restaurant industry to improve the follow-up petition The admissibility of 144 (43) catering industry petition, and have found at the scene of the risk of pollution from the installation of control equipment that is counseling, including counseling completed 22, including 2 Home-based electrostatic dust collector, 9 Home-based washing equipment, Home based easy buckets 8 and 3 Home-based activated carbon filters, including 628 tonnes of VOCs can be reduced pollutants. c. Observation of the outcome of the commanding heights Select the city's east, west, south and north directions to the commanding height of four observations, the implementation plan to December 31 only to observe the four directions 86 times, in which the commanding height of observation of 5 cases when the detection of contamination, that is, in Chiayi City North -- Bloom found wealth building housing fire, others to the scene to put out the fire by the fire, the other in Chiayi City - Lake sub-incineration plants within the road boundary, the Western (Hong Kong Ping Market Building), etc. found in open burning violations, inspectors Rapporteur on the first found time to fight a total of 7.052 tons can cut air pollution. d. The results of air pollution reduction The beginning of the implementation of the plan to December 31 so far, statistical fight open burning of the air pollutants can reduce the amount of 0.158 metric tons of TSP, 0.009 tonnes of SOx, 0.055 tonnes of NOx, 0.91 tonnes of CO, 0.393 tons THC. Another focus on the implementation of inspectors have found cases stacking and waste removal, reduction of pollutants can be reduced 0.136 metric tons of TSP, S0.008 tonnes Ox, 0.051 tonnes of NOx, 0.712 tonnes of CO, 0.365 tonnes of THC.
Keyword
air pollution,environment of Unsatisfied
Open
top