Examination and Auditing Inspection Project for Functions of Continuous Emission Monitoring System (CEMS) of Fixed Pollution Source for 95 year
Absrtact |
Name of Project:Examination and Auditing Inspection Project for Functions of Continuous Emission Monitoring System (CEMS) of Fixed Pollution Source for 95 year
Fam-Mei Technology Enterprise Co., Ltd.
Host of Project: Hung-Jung Tsai
Manager of Project: Huei-Li Li
Abstract
This project attained the tasks and inspection in accordance with labor purchase contract since on 4th,August,2006 till on 3rd, August,2007,The progress attainment was 100%.The task progress was shown in Table 1.The execution results are stated as below.
Table 1 Task progress and attainment rate statement (1/2)
NO Task Progress Attainment rate
1 Edit standard operating process 1 completed 100%
2 Inspection of Relative Accuracy Test Audit(RATA) 14 pipe completed 100%
3 Inspection of Opacity(OP) 14 pipe completed 100%
4 Inspection of Cylinder Gas Audit(CGA) 14 pipe completed 100%
5 Particulate pollution test for Emission Pipe 9 pipe completed 100%
6 Inspection of CEMS Signaling Than 13 pipe completed 100%
7 Order-compliance check 9 completed 100%
8 Evaluation System and Counseling Improve Operations 9 completed 100%
9 Monitoring noise of the environment and traffic 96 point-times completed 100%
10 Review of the internet connection report 12 month completed 100%
11 Copied and Built the internet connection data 12 month completed 100%
12 Safeguard website 12 month completed 100%
13 Exposure rate of environmental protection news 3 dispatches release accomplished completed 100%
Table 1 Task progress and attainment rate statement(2/2)
NO Task Progress Attainment rate
14 Order statement meeting 2 meeting completed 100%
15 Flue Test (NOx, SO2 and Particle) 10 pipe completed 100%
16 Equipment element test 3000 point-times completed 100%
17 Inspection and test of the public and private sites with liquid fuel 25 completed 100%
18 Inspection and test of the non-toluene hydrocarbon compound(NMHC) 12 pipe completed 100%
19 Odor pollution test 30 point-times 100%
20 Heavy-metal test for Emission Pipe 2 pipe completed 100%
21 Dioxin test(Emission Pipe or Peripheral boundary) 6 completed 100%
22 Technology transfer 1 100%
The execution result statement
1. The Continuous Emission Monitoring System inspection and edited quality assurance standard operating process:The quality assurance standard operating processes have finished. The result include:
(1)Increased the Basic information of Continuous Emission Monitoring System of Yong kang Incinerator.
(2)Check every procedure appear so as to the regulations type.
(3)Increased the checking procedure for software.
2. The Continuous Emission Monitoring System function inspection
The Relative Accuracy Test Audit(RATA) inspection was done in 14 pipe. There were 2 pipe unconformable emissions standards. In 14 pipe of Cylinder Gas Audit(CGA),Among them the checking rate is 100%, Among them all conformed emissions standards. In 14 pipe of Opacity(OP),was obtained 100% of qualification rate. Particle inspection was completed for 9 pipe, and it was obtained 100% of qualification rate too. In CEMS Signaling Than inspection, was obtained 100% of qualification rate. Above the result inspection were converged and analyze, in order to prove the data accuracy and availability of the monitoring instruments .The inspection result and qualification rate of the Continuous Emission Monitoring System was shown on Table 1.
Table 2
(95) The inspection result and qualification rate of the Continuous Emission Monitoring System
Total RATA OP CGA
SO2 NOX O2 Flow low medium high SO2 NOX O2
1st 2nd 1st 2nd 1st 2nd
Check- times 14 14 14 14 15 15 15 14 14 14 14 14 14
Qualified -times 13 12 13 13 15 15 15 14 14 14 14 14 14
Qualified rate 93% 86% 93% 93% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3. Factory inspection
The inspection and patrol operations on leading 9 factories with Order-compliance check. The inspection was engaged concerning deficiency and improvement condition was keep on inspecting. All the data and will be set in the fixed
|
---|---|