Taichung county「Stationary sources air pollutant inspection, control and emission reduction guidance plan」 of Year 2008.

Absrtact
This project focus on air pollutants patrol and inspection in stationary sources and the performance of special industrial regulation check within Taichung county, for example, air pollutants annual testing examination and regulation check testing etc. The goal is to control the emission reduction potential for every industrial in Taichung County. Main results of this project are below: (1). The compliance check of air pollutant in factories by inspection testing: we help 117 times of inspection testing, and 6 of them are fined. And we also perform 8 times of inspection testing. (2). ”Gas station bubble control” policy enforcement: we perform gas-air ratio test in 60 stations, station tank leak test in 15 stations, and 208 times forced fuel action inspection. We also finished 1014 questionnaires about no forced fuel. We also review 3 new gas stations application, 2 of them were passed. (3). Special industrial regulation check: 40 times patrols were performed, 3 of them were asking to improve. We also bring up with “Emission standards of air pollutants in power plant” regulation draft, which consulted experts and was held public hearing for twice. (4). Annual testing system management: we examined 599 reports. For those who had minor mistake were asked to fix them and report to the bureau again. We also gave 88 time in-situ no alarm inspection when stationary sources were performing their annual testing. (5). Fugitive sources control patrol: we examined 99 times of regulation compliance, the compliance ratio were above 81%. 5 sources were guided to improve their control devices. We patrolled 26 times of steel factories and bay area fugitive sources, the compliance ratio were above 70%. (6). Open fire control: 103 times open fire patrol were taken for business day as usual, 161 times open fire patrol were taken during rice harvest seasons. 20 spots of no open fire warming were set up. (7). Restaurant air pollution control: 107 times were performed, most of them were Chinese restaurants, 86.9% of them had set up air pollution control devices. (8). Emission reduction of Stationary sources: We followed 19 factories of their emission reduction plan; 8 ones were finished. (9). Tanks control in Western Pier of Taichung Bay area: 3 times of device testing were performed, 2 of them showed that the efficiency of air pollution control wasn’t enough, so we provided experts opinions to improve them. (10). We held 2 emission reduction meetings and 3 regulation meetings, and also helped database input of air pollution inspection and fine. A total of 372.950 tons emission reduction were achieved in the project. 9、Ration of Completion: 100%
Keyword
Stationary sources,Stationary sources air pollutant inspection,control and emission reduction ,guidance plan
Open
top