英文摘要 |
In addition to the above, the program this year also completed the following work items:
1. The average water street washing vehicles 1.052 tons / km.
2. Van amount of garbage collected dust on average 3.44 kg / km.
3. With the EPA, Environmental Protection Agency issued the air quality deterioration in communications,emergency deployment of street washing station near the car wash operation to strengthen 9.
4. Two dirt roads for emergency support.
5. Implementation of on-site inspection four times per month, plans were completed on-site verification during the implementation of 160.
6. EPA site inspections conducted with members of four.
Description of the work situation of project implementation as follows:
1. Operation of street washing
This project was implemented 24,818.94 kilometers length of street washing, the rate reached 113%.
2. Street sweeping operations
Sweep the streets during the implementation of this project length of 29,088.72 km to reach a rate of 104%.
3. Street dust load of work
Completed 10 road dust load sampling and analysis.
4. On-site audit work
During the project period to complete a total of 160 on-site audits.
5. Road survey work
Plan to check every month this year are nine roads to complete a total of 90 road census operations to a complete grasp of the status of implementation of the road..
6. Relevant operational guidance meeting
Completion of folding printed propaganda posters 1000 and 200.
7. Deterioration of air quality emergency response operations
With the EPA, Environmental Protection Agency issued the air quality deterioration in communications, emergency deployment of street washing station near the car wash operation to strengthen 9.
8. Emergency support operations
Support non-implementation of this project, the dirt road section of clean-up operation twice.
9. Real-time location system
Car cleaning and washing daily attendance records tailor driving track record of satellite positioning system, each 30 seconds record time, record data, including speed, UTM coordinates, time, townships and road name, etc.. As a reference the approved number of one kilometer.
10. Road adoption
30 enterprises completed road adoption goals.
11. Reported by the press release rate
Completion of four press releases, there are the newspapers.
12.Website maintenance and update the effectiveness of cleaning and washing the outcome of data entry database
Web page updated monthly Jieyou complete operation and maintenance of the effectiveness of cleaning and washing the outcome of data entry database.
13. Garbage packet loss, dirt and road damage separate notification Island
Project completed during the garbage packet loss 93 times, separating the island dirt road 40 times and 26 times dirty.
|