英文摘要 |
This project was implemented for 12 months from September 24, 2009 to September 23, 2010. By planning the offshore island industrial zone for the air quality purified area of diesel vehicle, this project was effective in controlling pollution of diesel vehicle in this area, and to improve the self-management and to promote the regular inspection of diesel vehicle. The results could be used for the reference to develop a total emission control strategy for diesel vehicle. By the approach of air quality improvement and establishing a feasible strategy for diesel vehicle pollution control, the results could be provided for Yunlin, Chiayi and Tainan as the promotion reference for diesel emission control.The major items of work in this project including:
1.Preliminary work of planning offshore island industrial zone for the air quality purified area of diesel vehicle, including survey of traffic flow, questionnaires, and the analysis of the moving pollution sources in control zone, and so on; collecting the relevant domestic and international control strategies as a reference for the implementation of this project.
2.Items and meetings handled in this project, including convening two conferences with invited experts and scholars; holding two conferences of communication and coordination and one legislation seminar; and the survey and analysis of 1000 questionnaires for the drivers or owners of the vehicle in the air quality purified area and the people living in neighboring township with industrial zone.
3.To promote the content planned in the project, such as, the benefit assessment of pollution reduction, evaluating the self-management and regular inspection of diesel vehicle, and planning the control method for the access diesel vehicle.
4.To develop a program for diesel pollution improvement, such as, establishing the license plate recognition system, planning the installation of the after treatment processor in diesel vehicle, developing a strategy of idle turning off for diesel vehicle, planning a program to beautify the air quality purified area and car pool system.
5.Assisting the Environment Protection Bureau to implement control operation. The operation content was performed according to the original plan of the project.
|