The execution duration of this project is from April 1st, 2009 to March 31st, 2010. The final results of this project were separately introduced as the following:
1. General inspection and on-site examination were executed at 413 institutions. After examination, there are additional of 29 institutions listed in the controlled list.
2. Total of 100 institutions were done with the emission amount examination and data renewal. Insufficient data, unreasonable emission, and institutions which have not been examined in the past three years are prioritized in this examination. Upon completion of examination, the following is found: particles pollutant decreased of 0.618 metric tons, SOx increased 4.894 metric tons, NOx increased 4.697 metric tons, and VOCs increased 46.235 metric tons.
3. Total completion of 100 institutions and there are 56 institutions permits not conforming to regulations with most of the reasons which the facilities are not in conformity with the approved content as stated in the permit (occupies 41%).
4. Aside from Sixth Naphtha Cracking Project, there are 175 permit application received. 98 Installation and Operating Permits were issued after evaluation. Investigations were carried out on time and data establishment upon permit issuance is completed within the stipulated one month period.
5. Through inspection, emission examination, and regulation conformity; this project completed the renewal, maintenance, and expansion of data of 200 institutions. In addition, gas station project reported the examination information of 232 gas stations. Therefore, the database of 432 controlled institutions is maintained, renewed, and expanded.
6. In year 2009 air pollution fee for all quarters levied NT$84,923,897. Payment reminders were being sent to 36 institutions with the only amount of NT$497,413.
7. Examination operation executed total of 20 of sulphur content in oil products. The principles in object selection are the institutions which previously failed the examination or the institutions complained by public. The result all conformed to standards.
8. For Continuous Emission Monitoring System management of air pollution stationary sources, an assigned personnel is responsible to process over-limit or upload declaration information. In every month, minimum of 2 times of data backup and operating system management need to be done. And, at least one time of hardware maintenance and system defragment are required every month.
9. 4 pollution reduction counseling were conducted. 2 institutions have completed the improvement estimate to be possible the decrement particles pollutant 10.633 metric tons.
10. 3 regulation promotion meetings were held. There were more than 60% of attendees in each of the above mentioned meeting. For those business owners who did make it to the meetings, brief meeting reports are available for download at Environmental Protection Bureau website. Besides, a counseling phone line is set up to answer questions of business owners.
11. GHG check at 6 factories was completed to estimate GHGs emission amount. The main source of GHG is the direct emission of category one, and over 99% resulted from stationary burning emission. This shows that in order to decrease GHGs of factories, improvement on fuel needs to be prioritized.
12. There were 113 gas stations that this project had performed Air to Liquid Ratio Recovery Performance Test (qualified ratio 86%) and 10 stations had performed Gas Leakage Test (qualified ratio 90%). The partial gas station must pass through the duplicate proven prescription to be able to achieve the laws and regulations degree of conformity. Obviously although the oil gas reclamation plant installs rate achieves 100%, but operated the maintenance still to dislike the insufficiency daily.
|