英文摘要 |
Abstract
1. Checking and Governing
Pingtung County governs 63 sand and gravel processing plants, wherein 45 plants are under normal operation, 18 plants have been shut down. Facilities of Sand and Gravel Processing Plant include 72 soil and stone warehouses, 24 sets of sieve, 64 sets of jaw crusher, 191 sets of vibrating sieve, 129 sets of cone crusher, 118 sets of stone and sand washing machine, 56 stone depots and581 pieces of conveying belt. As to pollution prevention facilities, 62 plants have been equipped with watering machine, 1 shutdown plants have got into trouble; 62 plants have been equipped with washing equipment, 4 shutdown plants have got into trouble, 1 shutdown plants have not yet equipped; 62 plants have established stores at entrance of plant, stores of 1 shutdown plants have been damaged and one shutdown plant has not built stores at all; 50 plants have built fence, and fence of 2 shutdown plants have been damaged, another 7 shutdown plants have not built and 7 operating plants have also not built; 61 plants equipped with crusher have all installed water-jetting equipment.
2. Strengthens the tracing control
Counseling 42 gravel pits converted vehicle washing facilities, stacked in fields covered by dust-proof mesh or plastic stabilizer regular spraying Sansen, watering equipment, set the meter, car washing equipment, water meter or a meter to set the factory stacked area access path and exposed areas such as the laying of gravel grading , in line with the "fixed pollution sources Fugitive particulate pollutants Air Pollution Control Facilities Management Measures", in line with rates from 0% to 93%. This year include 43 gravel pits have occurred in the checking process of pollution cases, mainly in car-washing equipment failures, watering facilities, failure, factory entrance pavement damage, before the implementation of the use of car wash equipment, plant watering inside and outside the work before the implementation of the factory into the entrance with the United color outside the roads, vehicular transport situations such as the main dust. In this project, keep track of all sand and gravel plant pollution counseling improved, the manufacturers are able to be completed in accordance with process improvements to improve the view.
3. Control of Source of Raw Materials and Establishment of Regulations on Material Yard within Plants
Sand and gravel stored in Pingtung County are about 109 million m3, 45 plants of the 63 governed sand and gravel processing plants have at present stored sand gravel in plant area,,, 18 plant without any gravel Duizhi raw materials, of which 7 gravel for the raw materials into the plant immediately after the broken washing, and 11 for the lay-off status.
4. To Push Forward the Maintenance for Connecting Transportation Systems
In this column counseling program continued to control the market for sand and gravel plant outreach adopt the road outside, the scope of the individual to adopt at least before the plant around the side of 50-100 meters; adopted include daily watering on a regular basis to clean the roads and road maintenance, and so on a regular basis . Up to date 11/30 counseling to complete a total of 20 roads to the outside, the length of 14.7 km of the work of adoption.Total length of 3445.4 kilometers wash brush.
5.Counseling Submit Surrounding Green Plant Plan
Up to date 11/30 , the plan has been completed counseling six gravel pits submit green plan, estimate 6 submitted to plant around the green plan the future, after the completion of Zhizai estimated reduction efficiency 4270.5 kg / year.
6. River Dredging and Pollution Control
This year a total grasp of Pingtung County, the implementation of the central canal dredging river Kao-Ping River Basin include 28, of which 13 is located in Pingtung County, and the other 15 regions are in Kaohsiung county, the amount of sand and gravel dredging estimated at 24.866 million cubic meters which Pingtung county 13 maintenance dredging dredging volume of 13.253 million cubic meters,. As of November 30, the total dredging volume of rivers and streams came to 229.2million metric meters, and the number of gravel transport trucks estimated at 163,714 vehicle dispatches. A total of 5 river/stream developmental dredging projects have been completed through installing truck hosing equipment, truck hosing equipment malfunction repair, and the addition of sprinkler vehicles to enforce the sprinkling work, together with asphalt laying on transport access roads, repairing damaged transport access roads, enforcing the dust cover on transport trucks and so forth for improving traffic dust. Another year, respectively, 4 / 10, 5 / 20, 6 / 12, 7 / 10, 10/27 and Kaohsiung County Environmental Protection Bureau jointly audit the implementation of the five operations, the implementation of a frequency of 1 times / month.
7. Catering Survey and counseling
242 restaurants this year to complete an inventory of the expansion of the database archiving operations, which accounted for 158 Chinese restaurants, 40 fast-food restaurants, western restaurants 21, combined 14 restaurants, six Japanese restaurants and other catering 5. There are 163 to install the pre-processing equipment, there are 84 pipes are installed in the end of processing equipment. Counseling 15 restaurants made pollution to improve the plan and set up pollution control measures to complete the improvement of soot pollution.The completion of 242 restaurants this year's inventory of the expansion of the database archiving operations.Counseling 15 restaurants made pollution to improve the plan and complete the improvements.
8. To Establish Response System for Defective Air Quality of Sand and Gravel Processing Plant
The current year has enlisted the gravel site poor air quality response mechanism as a promotional focus, under which the initial stage of the project calls for communicating and coordinating with the operators, and explaining to the gravel operators the importance of the poor air quality response mechanism, as well as a broad-based campaigning for poor air quality response measures, which would avail the operators to understand how best to collaborate with the environmental protection agencies in conducting an onsite pollution source response mechanism at the onset of poor or deteriorating air quality levels. From the initial stage of the project up to November30, a total of 36 poor PM air quality forecast have been reported at the air quality monitoring statements, and 19 PM poor real-time reporting made, in which the program has consistently been able to support the onsite audit by activating the poor air quality response mechanism. The onsite audit findings show that the participating gravel sites are able to support the program’s poor air quality response measures.
9. Drainage and Reduction
The project, upon completing the audit work, has uploaded the latest updated information of the “Fixed pollution source control plan” onto the “Fixed air pollution source management information system” database for updating the TSP discharge estimate4, which put the TSWP discharge volume on the 63 gravel sites enlisted for monitoring at 2,095.4 tons / year. The calculation of the discharge volume of the river/stream dredging project has the discharge volume estimated based on the audit findings deriving from the construction site pollution control plan using the Environmental Protection Administration’s “Construction site pollution control and surcharge management information system”. As of November 30, the county has completed the dredging work on a total of 5 river/stream dredging projects, with a total discharge volume tallied at 314.5 tons/ year.
The current year’s source volume reduction at gravel sites (plants) primarily calls for spearheading the operators to add pollution prevention equipment and improvement of the exposed grounds. As per the project implementation as of November 30, the reduction volume derived from computing the volume reduction efficiency by various prevention equipment came to 151.8 tons/ year, the reduction volume from the river/stream dredging projects came to 264 tons/ year, putting the total reduction volume at 415.8 tons/ year.
|