英文摘要 |
In the pre-operation area, based on review of management practices and related regulations, revised CEMS operating procedures and quality assurance check on July 14, 1999, submitted.
Monitoring equipment function check: the total at this stage of the project have been completed 20 times the flue relative accuracy test audit, completion rate of 100%, the test results of all test items are all 100% pass rate, offset correction factor (BAF) with oxygen and nitrogen oxides higher incidence after checking your vendor to observe the systematic deviation of the situation; opacity calibration error check the implementation of 25 times the flue, the completion rate of 100%, low, medium and high range of 100% pass rate, the error most of the less than 1%; while the standard implementation of 20 times the gas check, 100% completion rate, the test items are qualified, most less than 5% error; nitrogen to check for 6 root of time, the completion rate of 100%, the overall conversion rate has improved over the previous year to reach 85.2% 4.3% conversion rate for the poor of the plant was checked periodically after the recommended vendors should make their own tests, conversion rate should be related replacement supplies.
Monitoring check, the completion of this project at this stage a total of 20 group relative accuracy test audit and supervision of 25 sets of opacity monitoring inspection, test results are in compliance with laws and regulations. Because self-monitoring to check the implementation of audit work for the plant to plant, when supervision, so that failure of the plant monitoring results are at the scene told until after the plant to improve the implementation of self-review again, side by side to check the focus of the initiative.
Review of monitoring data: Monthly regular monthly review, and completion date, the effective monitoring of monthly transfer rate and the percentage of time statistics, some of the factory hardware and software for data processing system abnormalities or abnormal power plant, all of which might cause data loss or leakage pass, in principle, able to achieve the current daily transfer rate more than 99%. Monthly report, the various public and private spaces have encountered most of the monthly review of comments by amendment missing monthly rate of decline Jie, currently CPC and Formosa Plastics plant Linyuan monthly cumulative loss Jenwu plant a few more.
On-site air pollution fee system and check operations than on the side, a total of 16 games to complete checking the factory floor, the main problem for the software for data processing operations are still some problems, such as in the event of BAF, the relevant parameters required to return to return correct, very easy to problems, while the fiber offset correction factor (BAF) will have calculated the error occurred and the lack of the same year, must keep track of the situation to improve.
Some degree of regulatory compliance check in at this stage to complete a total of 15 plants 40 times to check operation, check for missing parts also keeps track of counseling to improve operations, in order to confirm the plant working group to improve the situation from time to time and to trace the operation of the plant, to enhance the connection factory quality assurance quality control, to increase the accuracy and reliability of the connection information, and yet more for the factory to improve the lack of contractor personnel are not familiar with operating and delay correction, except for this part of the working group outside the active trace also provide information for improved counseling facility, the current emission standards referenced in the fiber due to error, leading to error calculation RATA error, the original data is actually qualified to be ineligible, the time required to recalculate the invalid data and emissions, have asked the manufacturer for testing provided by the company The report should be self-check for errors, to avoid such a situation.
System functions to maintain connection and communication environment, in order to smooth the operation of the EPA host system, the host function and converting module for converting the performance of regular maintenance CIECC Ying and data equipment, to improve information availability to allow for side connection system can be more perfect.
Station operation and maintenance part of the implementation of 264 points periodic maintenance, the completion rate of 100%, TSP sampling to complete 264 points times, dust water sampling to complete 132 points times, TSP sampling and analysis completed 264 points times the dust water sampling and analysis completed 132 stations times, the completion rate of 100%. July 99 replacement carbon brush of the station, there is no unscheduled maintenance (abnormal failure), and equipment calibration into a single point of execution flow calibration station 528 times, multi-point flow calibration of the implementation of 44 sub-stations and trace a flow calibration Run 1, the corrected results are in line with regulatory requirements.
The total suspended particulate sampling inspection in accordance with the ring detection particulate pollutants in the air - high volume sampling method (NIEA A102.12A) implementation in July 1999 to 100 220 during the April meeting of the monitoring station, the measured value average between 16 ~ 244μg/m3, has not been exceeded during the air quality standards (24hr 250μg/m3); and the amount of dust falling behind atmospheric dust sample as a reference volume assay (CNS 3916) implementation, monitoring at 110 stations times results, with minimal pollution station times for the 106 (96.4%), minor contamination of 2 points times (1.8%), moderate pollution is 2 points (1.8%).
Manually update the part of the station, completed in April in 100 years Okayama Station, Alian station, tree stand and other three stations, the current account then the normal operation of all functions.
|