For improving air quality, the “Construction Engineering Pollution Control Project” has been performed for 14 years from 1997 by Environmental Protection Bureau, Penghu County. For this reason, let local construction engineering owner can understand deeply that contamination accident during the course of construction and related pollution control method for building site. To sum up, the project will keep promoting, and improving air quality of all Penghu County.
This project has to complete promoting Air Pollution Control Fees collection; inspecting & patrolling for the building site; providing guidance for the building site; promoting air pollution control; inspecting particulate contaminant of the building site ; and other related tasks during the period of performing.
1.There were 728 application cases in 2011, and the total ““Air Pollution Control Fees” collection amount was NT$ 8,246,136. TOP 3 was construction engineering on building (44.61%), other construction engineering (44.11%), and construction engineering on road (5.17%). Furthermore, there were 28 pressing for fees application cases and the total collection amount was NT$20,039; and there were 82 back fees application cases and the total collection amount was NT$174,958. The rate of pressing for fees, and back fees were 100%.
2.This project has patrolled the building site for 2,588 times, target number is 1,650 times, and accomplishment rate is 157%.
3.This project organized the coordination meeting for construction engineering owner who pay above NT$ 10,000 for air pollution control fees before start date.
There were 75 construction engineering owners came to the consultation meeting in 2011.
4.Guide 10 building sites to submit application cases for substitute contamination control equipment before start date in 2011.
5.This project has completed 20 TSP inspections near building sit; set up 16 monitoring stations for dust falling, and 2 monitoring stations for upwind and downwind in the building sit.
6.This project has completed spot checking 9 cases of the sulphur content of diesel equipment and the result was regulation.
7.This project has finished submitting 120 cases for violating the laws of regulation to EPB in 2011.
8.This project has completed 3 education training meetings.
9.This project has published 16 items of eco-friendly news in the newspaper; and dynamically displays 3 items of eco-friendly news on LED TV-WALL within a month to compensate for the lack of space.
10.No one was punished for violating the “Air Pollution Control Regulation”, “Water Pollution Control Regulation” and “Waste Disposal Act Enforcement Rules” by EPB.
11.In the tasks of promotion, this project has organized one big promotion and two small promotions.
12.The Building site owner adopted road was about 8,600 meters.
13.In the tasks of degree of satisfaction, this project has completed 58 questionnaires on the degree of satisfaction of administrative institution for building site owners and contractors, and 154 questionnaires on the degree of satisfaction of building site for those who live near the building sit.
|