100年度營建工程收費、稽查管制業務

中文摘要 本計畫執行期間共協助環保局開立3,592件繳款單,金額達44,229,285元,實收3,495件,金額達43,666,678元;完成14,796處次(含假日巡查1,137處次、道路管線工程巡查1,460處次及露天燃燒62處次)營建工地、道路管線工程、河川疏濬工程及露天燃燒之巡查及建檔作業;特定區域循正常程序申報之工地有364件,均依規定於申報開工後10日內完成第一次巡查;巡查發現工地污染情形向環保局作A、B級提報,提報總數為848處次,A級提報計有237處次(佔提報案件27.9%)、B級提報計有611處次(佔提報案件72.1%);經稽查處分案件計有80件,其中違反空污法第23條第2項所定管理辦法案件計有64件,佔總告發案件比率80%,處分金額合計3,102,000元整;違反空污法第16條第2項所定收費辦法計有16件,佔總告發案件比率20%,處分金額合計122,500元;告發案件經追蹤改善已有79件改善完成,告發改善完成率為98.75%。二處即時監控系統設置及監控成效顯著,發現1處未申繳空污費及3處次違反營建管辦情形;另完成8場次法規宣導說明會及2場次人員法制教育訓練會之辦理。 一、二、三級巡查納管工地數比率達84.8%,符合環保署巡查納管工地數比率考評滿分要求70%,同時也協助環保局取得環保署100年度考評在直轄市組特優佳績。
中文關鍵字

基本資訊

專案計畫編號 經費年度 100 計畫經費 10890 千元
專案開始日期 2011/07/13 專案結束日期 2012/04/07 專案主持人 陳美霞
主辦單位 高雄市政府環境保護局 承辦人 蘇偉嘉 執行單位 環佑實業有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 高雄市100 年度營建工程收費稽查管制業務期末報告.rar 160MB

Construction engineering fees, inspection and control business in 2011

英文摘要 The Kaohsiung Environmental Protection Bureau (EPB) was assisted to print 3,592 payment slips during the execution of this project, amounting to $44,229,285; in which of $43,666,678 accounted for 3,495 paid-up payment slips. There were a total number of 14,796 construction site inspections, including 1,137 holiday inspections, 1,460 road pipeline construction inspections and 62 open-air burning activities. 364 construction sites declared through normal procedures had been inspected within 10 days after the construction start date, by the regulations. Furthermore, we reported a total of 848 cases of Level A and Level B site contamination to the EPB throughout the construction inspections, Level A had been reported 237 cases (accounted for 27.9% of all reported cases), grade B had been reported 611 cases (accounted for 72.1% of all reported cases). Penalties were given out to 80 cases, in which of 64 cases violated the subparagraph(2) of article 23 of the Air Pollution Control Act (2011) (accounted for 80% of the total penalized cases), associated fines came up to the amount of $3,102,000. The rest of 16 cases violated the regulations of the Air Pollution Fee System according to the subparagraph(2) of article 16 of the Air Pollution Control Act (2011) came up with the fines of total $122,500 (accounted for 20% of the total penalized cases). From the follow-up inspections, 79 cases (accounted for 98.75% of all penalized cases) have demonstrated appropriate improvements. Two real-time monitoring systems had proved to be effective, it was discriminated that one construction site had not made the payment for air pollution control fee and three other cases found to violate the construction management regulations. 8 sessions of “regulation promotion and legal education” seminars and 2 personnel regulation training sessions were completed. The ratio of inspections to the total construction sites of grade 1, grade 2 and grade 3 was 84.8%, which reached the minimum requirement (70%) for the excellent grade in performance appraisal of Environmental Protection Administration. Furthermore we assisted the Kaohsiung EPB to obtain the excellent grade among the municipality group in performance appraisal by Environmental Protection Administration of Executive Yuan in 2011.
英文關鍵字 Construction projects,ratio of construction law,TSP reduction rate,air pollution fee of construction projects