100年度「CEMS系統管制暨人工測站操作維護業務」計畫
中文摘要 | 監測儀器功能查核方面:本計畫共計已完成20根次煙道相對準確度測試查核,完成率105%,檢測結果所有測項合格率皆為100%,偏移校正因子(BAF)以排放流率發生率較高,查核後也請廠商留意是否有系統性偏移之情形﹔不透光率校正誤差查核執行19根次煙道,完成率100%,低、中、高範圍合格率均為100%,誤差大部分小於1%﹔而標準氣體查核執行19根次,完成率100%,各測項皆合格,誤差大部分小於5%;二氧化氮查核進行11根次,完成率100%,整體轉化率已達到93.84%較上年提升8.6%,對於轉化率較差之工廠已於查核後建議廠商應自行定期測試,轉化率低時應更換相關耗材。 | ||
---|---|---|---|
中文關鍵字 | 連續自動監測;不透光率;標準氣體;相對準確度測試 |
基本資訊
專案計畫編號 | 經費年度 | 100 | 計畫經費 | 7980 千元 | |
---|---|---|---|---|---|
專案開始日期 | 2011/09/09 | 專案結束日期 | 2012/03/31 | 專案主持人 | 葉雨松 |
主辦單位 | 高雄市政府環境保護局 | 承辦人 | 龐心佩 | 執行單位 | 瑩諮科技股份有限公司 |
成果下載
類型 | 檔名 | 檔案大小 | 說明 |
---|---|---|---|
期末報告 | 100CEMS.pdf | 2MB |
The CEMS control-cum-manual station operation and maintenance business
英文摘要 | Monitoring instrument function check aspects: the RATA has been completed 20 times, the completion rate of 105% of the test results for all test items pass rate was 100%; the opacity correction error checking to perform 19 times, the completion rate of 100%, low, medium and high range pass rate are 100%, the error is mostly less than 1%; the CGA perform 19 times, 100% completion rate, measured items are qualified error is mostly less than 5%; nitrogen dioxide audit carried out 11 times, completion rates 100%, the overall conversion rate has reached 93.84 percent over the previous year to 8.6% increase in poor conversion rate of the factory was recommended that manufacturers should check themselves regularly test related supplies should be replaced in the conversion rate is low. The operational aspects of site assessment, at this stage, completed a total of eight games on the factory floor checking, the main problem for the software for data arithmetic processing, there are still some problems exist, such as the gas substance opacity effective when the number of different, MDF RATAmiscalculation missing the same with the previous year, to keep track improve the situation. Regulation compliance inspection part, at this stage, completed a total of 30 times checking work, keep track improvement assistance and for checking the missing part of the job, in order to confirm the plant to improve the situation working group from time to time and traced to the plant operation, take this enhance the connection factory quality assurance quality control, increase the accuracy and reliability of the connection information, and has yet to improve the lack of multi-contractor for factory personnel are not familiar with jobs and delay correction for this part of the working group are also available in addition to actively track the relevant information counseling factory improved MDF emission standards misquoted, leading RATA error calculation error, and have asked the manufacturers to the report provided by the testing company shall check whether the error to avoid such situations. | ||
---|---|---|---|
英文關鍵字 | CEMS;CGA;OP;RATA |