The execution duration of this project is from April 1st, 2011 to February 29th, 2012. The final results of this project were separately introduced as the following:
1. Accepts permission application document 212, issues after due investigation 93 permits, rejects the application to be 53, other for in examination or test run.
2. The coordinate EPA third-level against system area promotion to the second-level against system area work, the air pollutant allowed that reduces the quantity to equal various air pollutant to reduce the total suspended particle pollutant 22.864 ton/years, the sulfur oxide compound 85.793 ton/years, the nitrogen oxide 87.34 ton/years and the volatile organic compounds 169.456 ton/years
3. There are 15 factories acquisition “Easy to cause air pollution material’s permit “, contains 15 the unburned coal use permit, the Formosa Plastics Group petrochemical gets extra the permit for refinery coke and the sulfur content surpasses 0.5% liquid fuel. In 2011, unburned coal total amount of use are 13.888 million tons.
4. The scene inspector general examines 241 (spot) time, including 81 regular examinations (spot) and 160 testing operations and 164 reports examination on internet.
5. Total inspection of 100 factories and there are 27 factories not conforming to regulations with most of the reasons which the facilities are not in conformity with the approved content as stated in the permit (21 factories, need to submit application ).
6. Completes the factories investigation of the Douliu Industrial Park and 135 factories should be under controlled; And anticipates product type screening according to the use original to carry on the fingerprint material examination.
7. In 2011, accept 1,730 of the declaration cases for air pollution prevention fee, and total collection amount altogether 101,156,136dollars.
8. Completes 424 inspections for air pollution prevention fee declarations, through counseling and revised incorrect declarations the final correction rate is 53%.
9. Finished the unexamined air pollution prevention fee declarations, After consults many times with calculates, pays and submits in 100.10.27 reexamination notices, the sum total altogether should pay and submit 21,683,234 NT dollars.
10. 117 gas stations are under control, completed 50 cases, 740 gasoline grease gun of the gas-to-oil ratio examination and the qualified gun number is 694, the average qualified rate is 93.78%,1 stations is not qualified; Completes 30 cases of the inferior gas leakage examination, 3 stations are not qualified. All the qualified stations will get the fines.
|