英文摘要 |
Project name: 2011 Penghu County Mobile Pollution Source Control Project
Executing period: From March 7, 2011 to December 31, 2011
1. In the tasks of inspection, notice number was 42,234, checking number which returns to the vehicle registration place was 28,982, and the rate of participation was 68.62%; checking number which returns to the inspection station was 23,840, and the rate of participation was 56.45%. Compare with last year, it’s 5.48% (registration place) and 5.31% (inspection station) growth respectively. In the government performance assessment, calculate the rate of participation for those data that return to the vehicle registration place, this county is ninth in the country. It’s better than last year.
2. In the tasks of the identification system, this project has completed 37,849 cases and the rate of non-inspection was 13.7%; the rate of the motorcycle that was registered in Penghu County was 79.3% in which the rate of non-inspection was 79.6%; the rate of participation for those motorcycles that when they received the notice with picture and go to inspect was about 68.7% during the period of performing.
3. In the tasks of mobile inspection van, this project has completed 7,002 cases, and the monthly average was 583 cases.
4. In the tasks of notice, this project has to complete delivering 55,000 postcards, so far, this project has delivered 58,321 postcards; the accomplishment rate was 106%.
5. In the tasks of the patrolling, this project has completed 4,289 cases, and the rate of participation was 70.20%.
6. In the tasks of the inspecting motorcycle on the roadside, this project has completed inspection 598 cases (Include 72 cases that have been inspected), in which, the qualified number was 424, margin number was 139, and unqualified number was 35; the total unqualified rate was 5.85%.
7. This project has taken 1,523 pictures for the smoky motorcycle, and the average rate of participation was 72.02%.
8. In the tasks of the comparing gas concentration, all results were within error range. In the tasks of the inspection mark, there were 3 inspection stations that mislabeled the Blue Mark, they were Hong-Long, Xi-bie-hang, and Ri-Li respectively; and besides, there were 2 inspection stations that mislabeled the Yellow Mark, they were Ri-Li, and Dong-Tai respectively.
9. In the tasks of checking inspection station, there were 3 stations that the unqualified rate was higher than else. They were Jin-Yang (11 times), Quan-Neng (8 times), and Ri-Li (7times) respectively.
10. In the tasks of inspection diesel vehicle, there were 351 cases that have finished the visual judgment of the smoky diesel vehicle. In the survey, the opaque rate ranges between 20% and 30%, in which, 25% was most than else, and that was 61.5% of all cases.
11. In the tasks of the spot check on the sulfur content, target number was 125.This project has submitted 163 cases to inspect, and the accomplishment rate was 130%. In which, there were 163 cases has finished inspection, and three unqualified cases that has completed re-inspection, the unqualified rate was 3.7%; others meet the government regulations.
12. This project organized one big promotion and thirty electric motorcycle promotion test ride campaigns
13. This project has finished the review, inspection, and appropriation of the out of age 2-stroke motorcycles subsidy application submitted by people during the period of performing. There were 221 application cases in 2011.
|