英文摘要 |
From March 4, 2011 to December 11, 2011, the results of the work are summarized as follows:
I. Implementation of the rules and regulations
This project is currently running all the test operations, including 20 periods of the detection sampling tests of sulfur content in oil, odor sensory measurement sampling tests and detection sampling tests of the perimeter granular materials, 5 periods respectively, discharge pipe three, gas station oil ratio and leakage detection 12 stations, and incineration plants RATA and heavy metal detection 1 time. Except for one odor detection not meeting the standard, the other tests all met the standard in compliance with laws and regulations. In the aspect of air pollution fee collection, the air pollution fee collection procedures have been completed from the 4th quarter of 1998 to the second quarter of 2011. A total of 62 plants have completed their procedures of air pollution fee collection. The average declaration rate, fee-paying rates and late fee-paying rate are 100 %. As for the sulfur oxides and nitrogen oxides air pollution fee check, , currently a total of 51 has been completed. As for the check of air pollution fee for volatile organic compounds, a total of 58 has been completed. In this year, places being checked, there were only 2 incorrect declaration, which didn’t affect the payment amount, and the still minimum amount of fee is NT$ 900. The project team has been corrected on-site, counseling and helping to re-estimate the emission amount.
II. Promotion of the licensing system
This year till December 11, there were eight cases of permit applications, which were 2 replacements of operating licenses and 4 applications of permit transaction and extensions of operating licenses respectively. Among them, one case of application for license extension was rejected. The other ten operating permit application have been reviewed and issued nine licenses and the other three operating license application has been approved and has entered the license-making permit. The plan was made for the effective implementation of the licensing system. There were 43 implementing license check. And all the industries were in line with the industry regulations.
III. Updating the list of stationary emission sources
At this stage, there are 132 updates and maintenance of the database QA / QC operations. After the updates, the total controlled public and private place for the stationary pollution sources in Chiayi City are 354. From the filing-completed stationary sources database statistics, it showed that in the part of process pollution emissions the particulate pollutants are 41.74 tons/year, SOx, 21.70 tons/year, nitrogen oxides 115.20 tons/year, volatile organic compounds 136.76 tons/year, and carbon monoxide 33.96 tons/year.
IV. Related jobs
In the project, we have now completed a total of 493 cases on protracted inspection operations, held four staff education and training conventions and two advocacy briefings. In addition, the project team has organized a drill during the incidents of air pollution emergency to enhance the emergency response capabilities in the city.
|