100年度營建工程污染管制及查核計畫

中文摘要 本計畫執行期程一年,自100年4月1日至101年2月29日止,本計畫主要工作重點為協助環保局加強辦理各項營建工地、管線、道路施工之稽、巡查工作,並將列管工地資料建檔管理,透過宣導文件發放及輔導工地座談會之進行,加強工地對污染防範之認知,以落實污染改善之目的。計畫執行期間,本計畫總計列管3,674處工地,累計巡查數達7,229處次,經由例行性巡查並將工地資料如期建檔外,且辦理4場次營建工地污染協商會說明會,輔導44處營建工地執行道路認養,洗掃總長度達80,368.218公里,並透過粒狀物及油品檢測當佐證資料(執行10點次TSP檢測及20件次油品檢測),逸散TSP總計削減5,140.25公噸,削減率為61.25%。 依營建工程納管率近三年作比較,統計結果顯示由98年的95.41%、99年的97.30%、提高至100年的99.06%。 在告發處分方面, 98年共告發11件 (依空污法告發11件),因民眾陳情而被告發處分者計有1件;99年共告發36件 (依空污法告發34件,廢清法告發2件),提昇100年度共告發60件(依空污法告發55件,廢清法告發5件),告發處分件數為歷年最高。 以歷年排放情形可以看出,本計畫成效較歷年為佳,削減率已逐年提升,足以呈現環保單位對營建工程管制策略,獲得累積的成效。
中文關鍵字 營建工程

基本資訊

專案計畫編號 YLEPB-100-014 經費年度 100 計畫經費 9855 千元
專案開始日期 2011/04/01 專案結束日期 2012/02/29 專案主持人 林宏斌
主辦單位 雲林縣環境保護局 承辦人 邱麗蓉小姐 執行單位 理虹工程顧問股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 100年度雲林營建期末報告(定稿).pdf 13MB

The project achievement report of Environmental Protection Bureau, Yunlin County

英文摘要 This project started from 1st of April in 2011 to 29th of February in 2012, lasting a year. It mainly assists the bureau to inspect and check the construction sites, pipes and road works, archive the information of the listed construction sites, and improve the knowledge of pollution prevention by distributing information leaflets and providing consultation for seminars of construction sites. In the period of this project, 3,674 building sites were listed for inspection. The number of inspections was 7,229 in total. All the listed construction sites were regularly checked and their information archived. Four seminars about negotiating construction pollution were held. 44 construction sites were helped to carry out Road Adoptions Scheme, in which they successfully cleaned up to a total of 80,368.218 kilometers of roads. Based on the particles and oil tests as supporting evidence (8 times of TSP test, and 20 times of oil test),the amount of fugitive TSP was be reduced by 5,140.25 metric tons. The reduction rate was 61.25%. To compare with the statistics of past two years, the control rate of Constructions in 2011 increased to 99.06% while the rate in 2010 was 97.30% and 95.41% in 2009. In terms of denouncement and penalty given, in 2009, 11 cases were reported (all violated Air Pollution Act) and one of the cases was denounced by the public and the penalty was given while in 2010, 36 cases were reported, including 34 cases violated Air Pollution Act and 2 cases violated Waste Disposal Act. The highest denouncement rate of all time is in 2011 which has 60 cases reported, including 55 cases violated Air Pollution Act and 5 cases violated Waste Disposal Act. In addition, comparing the emission reports in the past years, the project has the best achievements of all time. The emission rate is decreeing year by year which shows the controlling strategy of the environmental bureau towards constructions has accumulating positive performances.
英文關鍵字 construction