英文摘要 |
The main work of this project is inspecting and cataloging all kinds of construction sites in Kaohsiung City. The project has accomplished 33,852 inspection rounds of construction sites, road or pipeline projects, river dredging projects and reported pollution sites including 4,476 inspections for the holidays and 4,558 for road or pipeline projects during implementation period (2012/07/06 to 2013/12/31). The ratio of inspected sites to the total construction sites that report payment of air pollution control fees was 93.0%, and the proportion to meet the “Management Regulations for Construction Project Air Pollution Control Facilities” was 89.4%. The emission reduction rate was 57.9% since the production and reduction amounts of total suspended particulates (TSP) of construction sites in the city were 12,357.3 and 7,153.3 tons respectively. Furthermore, through field inspection we reported a total of 3,462 cases of pollution level A and level B to the Environment Protection Bureau Kaohsiung City Government, and 63 of them were fined a total of NT$3,060,000. However, verification checks have proved the implementation of improvements of all the sixty three sites to be truthful and complete after punishment. With respect to test, the project has executed fifty one TSP tests (results ranging from 2.6 to 17 ppmw) for peripheral boundary of construction sites and seventy five gasoline or diesel composition tests (results ranging from 25 to 397μg/Nm3) for the engines of construction machinery respectively. All results met related standards and limits. Moreover, seven construction sites having great pollution potential were selected to set up real-time monitoring systems, and two sites were reported and fined for violating the management regulations mentioned above. As regards regulation promotion, not only four regulation promotion sessions and two legal educational training workshops were held but two pollution control evaluation competitions plus public recognition for construction sites have been taken place during implementation period. The project also used mass media to enhance the promotion effect. Through eighteen months of efforts, we hope construction projects in Kaohsiung City can strengthen their adoption of air pollution control measures to reduce particle pollution and minimize public inconvenience effectively.
|