英文摘要 |
The purposes for this project are focus on review and control the system operation, running and management of the effects for CEMS. The targets of this project also included that helping Taiwan EPA to collect the latest CEMS regulations of foreign country, CEMS audit results for Taiwan EPA and local EPB, revise the CEMS regulations and rise up the efficiency of the management system of CEMS. We implement the air pollution control works and grasp that should be set the stationary sources continuous monitoring facilities and assist local competent authority in the management of public or private premises monitoring facilities operation and maintenance situations, computer programs, and monitoring data whether is true. Based on these results, we promote the specialized ability of applied management for CEMS business contractor personnel.
We completed collecting the information of the clean air plan in next five years for CEMS control, the demands of the CEMS audit and control over the years, and the newest CEMS law of foreign country, and then we proposed the strategic framework of the next CEMS overall control, according to the domestic and international CEMS control information, the CEMS audit and control results, and the case of CEMS monitoring data which was falsified in 2010, we will propose domestic CEMS future overall control objectives and strategies from 2013 to 2015. Moreover, we make the detailed report of the foreign development for heavy metal CEMS, Hg CEMS/Sorbent Trap Monitor and PM CEMS. We develop a standard operating procedure manual, which not only contains a variety of monitoring data collection and analysis procedure, but intersperses with examples of the case of CEMS monitoring data which was falsified and verifying the data quality by CEMS data analysis methods in the text.
In view of all previous counselling and audit work, we develop the counselling question registers, establishment quantity as well as fitting in law control index of public or private premises, and we complete the design of public or private premises monitoring facility establishment counselling to register the table. The semiconductor industry CEMS for 37 stacks and the flares CEMS for 31 stacks have set counseling. The petrochemical industry CEMS for 15 stacks have investigated the feasibility of establishment. The optoelectrics industries for 11 stacks have carried out relative accuracy test audit on site. Matching audit plan with the air pollution fee checking 10 flues, we select 25 samples of standard gas of six flues for six factories, and then we transport collecting samples to test the standard gas concentration. By this audit work, we assess the ability to confirm the domestic monitor facility standard gas by the domestic standard gas authentication organization, which can be used as the basis for future standard gas control and repair method
By CEMS monitoring data, we establish a domestic localization emissions characteristics, which may be in order as the relevant personnel in the future to determine the various public and private spaces CEMS monitoring data is correct and reasonable basis for various parameters of batch analysis (such as the sources of pollution scale, operating load, pollution sources operating conditions (for example fuel type, since the shutdown during normal load), and the source of pollution control facility operating conditions) and the correlation of emission data and trend profile. We compare the difference of emission pollution sources for the same type and the same size at the same time, and its differences with reasonable comparison with the relevant literature. We complete the build extract, transform, and load (ETL) packages for data warehousing. Host and the Environmental Protection Department of the local competent authority by the development and installation of the ETL mechanism to reach the EPA monitoring data extraction, transformation, load compiled to the EPA database mechanism and periodic data synchronization purposes.
. In order to enhance the specialized ability of applied management for CEMS business contractor personnel, we develop CEMS application management curriculum teaching materials, which contain the principle of monitoring systems analysis technology, the CEMS laws, the check of monitoring systems, the application of data quality assurance, monitoring systems confirmation procedure counselling and the independent management control. The method and principles of data a variety of measures are only for the contractor personnel of competent authority for workshops. In addition, we invite experts and scholars to review comments, and revise textbook for the CEMS application management curriculum materials, and then we develop the competent authorities and the public and private spaces CEMS business contractor personnel regularly train and back to the training of the system, which build system web interface, users through all functions of the operating system of the Internet browser.
To grasp the CEMS development and application of the laws for the reference object (USA, Canada) in Taiwan, we understand the U.S. federal and local environmental protection authorities CEMS control behind spirit and the evolution, simultaneously we discussed to the source of pollution scene and the factory correlation personnel, and then we understood the attitude of the sources of pollution laws and related CEMS and the actual management by visiting U.S. from Oct. 14 to Oct. 21 2012. By the itinerary, the two sides not only establish the initial friendship, but also lay the road of exchanges and co-operation for the future.
|