英文摘要 |
The scheduled implementation of the Program herein shall be covered from April 25, 2012 to January 31, 2013 with a total of 9 months. The tasks mainly include, but not limited to, Maintenance & Management of Clean Air Zone, Investigation & Consulting Improvement for Generalized Bare Lands, Dust Prevention & Control on the River, Implementation of Green Manure or Afforestation Subsidies Promotion of Garden City Prospectus Planning in Cooperation with Low-carbon City & A Variety of Propaganda that each itemized work has proceeded as schedule.
(1) Maintenance & Management of Clean Air Zone
1. Self-assessment of the Clean Air Zone: Indicated from the result, each zone is maintained in good condition, especially including but not limited to three locations, Phase 2 Liyuan Park of Taiping District, Bikeway of Tungfeng Green Corridor), Rulau Park .
2. Health Check of Plants: Indicated form the result, a total of 107 acre of lands are in poor conditions where pest problems constitute a major part of it; a total of 89 items have been improved and 18 items are under improved, which the fulfillment rate is about 83.17%.
3. Promotion of Adoption of Clean Air Zone: There are 8 places in adoption additionally which with 15 places a total fulfilled adoption process and the adoption rate is 42%, 9.47 acre a total in adoption.
4. Measurement of Carbon Sequestration: There is one zone as mentioned above fulfilling survey of carbon sequestration, where a total of 490 arbors are with totaled 3.561 ton of CO2 in carbon sequestration.
5. Maintenance & Management of Clean Air Zone on the website of Environmental Protection Agency (EPA): The page of Clean Air Zone is finished on the website in May, 2012, which URL is http://210.202.166.164 and with regular updates.
6. Photography Contest and Sweepstakes for Clean Air Zone: There were a total of 661 photographs available for selection and the Awarding Ceremony was held on November 20, with exhibitions held in both sides of stairs at 1st Floor of EPA, Taichung City Government during December 3 ~ 11, and next to the railway platform No. 1 of Taichung Railway Station during December 15 ~ 30; there were a total of 310 people registering in the Sweepstakes and almost 1,057 works for the Contest; the process of drawing winner in the Sweepstakes and Prize distribution have been accomplished.
7. Survey conducted in the Bikeway: A total of 41 bikeways with scenery sites alongside within this city have been surveyed and recorded in the program which are also updated on the website concurrently.
8. Assistance in Green Beautification: A total of 16 places of green plantation have been filed with field review and 21 meetings as to budgetary review of green plantation have been filed which 12 places totaled are approved and another 2 low-carbon city facilities are in completion of subsidy filing; besides, a total of 23 solar-powered LED street lights have been set. It is predicted that TSP will be reduced by 0.555 ton/year and CO2 by 24.84 ton/year.
9. Assisted in review of green plantation for campus and plant after 2009 where a total of 208 places have been reviewed; in accordance with the result, the survival rate in the port comes in the least with poorer condition of development.
10. Hosted a variety of propaganda: Such propaganda as to Maintenance & Management of Clean Air Zone this year had 82% attendance rate; subsidies filing & setting focus had 95% attendance rate; annual work review & discussion meeting for cross-division & bureau maintenance & management unit air quality purification zone had 97.06% attendance rate.
11. Conducted Survey of Satisfaction with Clean Air Zone via Questionnaire: Residents in Taichung City were the subjects in the Survey.
(2) Bare Land Survey & Improvement
1. For general type of bare land checks, there are a total of 84 lands listed for management (total area of 25.39 acre), among of them, a total of 62 lands have been improved (total area of 21.87 acre).
2. For the outcome of firm/plant afforestation, a total of 28 plants had been filed with plantation and afforestation, where a total of 6.255 acre in plantation and predicted to reduce TSP3.215 ton/year.
(3) Dust Prevention & Control on the River
1. Checks and Control of Predilection Points with Dust on the River: A total of 30 points are listed for management and with at least once patrol monthly; there are a total of 11 areas with potentiality of dust on the river.
2. Related meetings called for Prevention and Control of Dust on the River: A total of 2 meetings have been called to hold with another one large-scale propaganda.
3. The outcome of the prevention and control for Dust on the river: A total of 110 acres have taken prevention and control measures for dust on the river by each unit this year.
(4) Subsidies for Agricultural Land with Green Manure
There are a total of 13 administrative regions with 400.015 acres planted with cosmos green manure this year, along with Wheat Cultural Festival of Daya District held in 2013, which predict to reduce a total of 35.4 ton of total suspended particulates (TSP) and 17.7 ton of PM10.
(5) Promotion of Garden City Prospectus Planning in Cooperation with Low-carbon City & A Variety of Propaganda
With the operating mechanism developed this year and feasibility evaluation and analysis, subsidies for afforestation in cooperation with low-carbon model community or suitable region are suggested to extend in a point-line-surface manner for intention of building a garden city.
|