英文摘要 |
The content of the final report of the pollution control plan for the construction project of Hsinchu City in the year of 101, the commissioned unit Kangting Engineering Consulting Enterprise Co., Ltd. assisted in the implementation of the inspection and control of construction projects in Hsinchu City, the inspection of management methods, the construction of air pollution charges, and the declaration Guide work and other work, all work items are completed according to the planning progress, detailed work execution methods and results are described in chapters.
Based on the concept of improving the quality of service for the people, the declaration of the air pollution fee for the construction project was changed from the declaration orientation to the satisfaction of the public's satisfaction with the quality of the application. The overall collection operation focused on the overall service performance and quality of the project, and in enriching the air pollution fund. During the project period, a total of 12,480,654 yuan was built for air pollution. It also cooperated with telephone notifications and issuing documents to increase the reporting rate of air pollution charges, and on-site inspection of engineering changes, so that the construction of air pollution charges will be put on the track.
As far as the control surface is concerned, according to the regulations on the management of air pollution control facilities for construction projects, the action plan such as grade inspection, color list control, persuasion notice and site on-site counseling will be promoted to promote the site to actively carry out pollution prevention and road adoption. In addition to the work, he also invested in manpower to gradually inspect the first and second-level construction sites within the jurisdiction. During the project period, a total of 3,278 site inspections were completed, and the missing projects were also strengthened through the special control of the Guanpu Re-zone. In promoting the adoption and cleaning of roads on the construction site, a total of 26 people participated in road cleaning operations to help maintain the environment and reduce street dust. The maintenance and repair mileage of the construction project totaled 7,884.2 kilometers, and the number of cleaning mileage was nearly three. The TSP reduction was 108.8 metric tons.
The project inspection control is mainly based on the top 100 monthly pollution, and the patrol emission ratio is over 80%. In addition, it assists in the implementation of 430 cases of public nuisance cases to deal with public grievances. In the implementation of the publicity work, through the statute briefing session, the site on-site counseling symposium, the promotion of the text and the promotion of electronic media, and the promotion of the effectiveness of the promotion by diversified propaganda, the manufacturers are familiar with the requirements of the law, and by environmental protection The exposure of the news has increased public satisfaction.
Overall, the TSP emissions from construction projects in 2001 were 1,785.8 metric tons, an increase of 12.6% over the same period of the previous year. The reduction rate of particulate TSP pollution was 57.4%. In the case of a significant increase in pollution, the reduction rate was higher than that in the same period of 100 years. 6%.
|