The project commenced on June 1 2012 and ended on February 28 2013. Major tasks in the 9-month implementation included Air-pollution Prevention Fee Collection against construction projects, site audit and control, promotion of site autonomous management and urban beautification, pre-alarm management, promotion of construction project control and defect consultation, form reporting & data analysis, etc.
Regarding the Air-pollution Prevention Fee Collection against construction projects, a total of 3,645 cases has been reported, of which 35 cases were exempted for paying the fee. Fee collection totaled 95,832,582 NTD, data compilation of all reported cases was accomplished for control. 88.3% of the cases completed the payment, 96.2% of notification for payment were successful. Project completion totaled 1644 cases, the total area of completion reached 535,007m2. Statistically, the average number of projects under construction was 2,146 cases per month, with a total site area of 3,934,697m2. 184 new applicants agreed on a Short Message Service reminder for account settlement on completion of project; up to now, a total of 190 messages has been sent.
In the aspect of audit/patrol and control of construction sites, in order to cope with the implementation of Regulations on Management of Air pollution Prevention Facilities (hereafter referred to as “Management Regulations”), the project accomplished 11,180 audit/patrol operations during the implantation period. Accomplishment for becoming aware of emission quantity reached 92.2%; attainment of patrol jurisdiction reached 71.95%; reduction of emission reached 55.9%; sites that failed to conform to the Management Regulations were given notice for improvement within a deadline; statutory compliance to the Management Regulations of Class-1 sites was 88.5%, that of Class-2 sites was 87.6%. Signature Ratio of site personnel was 77.3%. Oil inspection of construction machines totaled 80 points, of which 1 inspection point exceeded sulfur content standard (50ppmw max.) and 1 inspection point exceeded sulfur content standard (10ppmw max.), all the rest complied with sulfur content standard (10ppmw max.), reaching a compliance ratio of 98%.
In the promotion of site autonomous management and urban beautification, adoption of roads surrounding the site succeeded 25 cases, total length of road-cleaning reached 38,660.0km, coordinated with 40 tailing operations in coordination with construction sites where pollution was prone to occur during the excavation stage, all of which has successfully accomplished counseling.
Promoted and counseled 3 construction sites within the county for setting up moveable plantation fences, with a total area reached 251.79m2. Promoted 3 sites, area totaled 3,288.6 m2, for bio-pavement by way of vegetation. Promoted 41 sites within the county for participating the Pollution Prevention Emblem activity.
Accomplished 10 stations per quarter, a total of 30 stations for the whole period, for Pre-alarm Management of dust monitoring. All recorded values showed improvements. 11 presentations of relevant counseling had been carried out during the project implementation, with an average number of attendees of 50-100. All participants interacted smoothly and reached the aims of the promotion and counseling. All the contractual tasks of the project had been accomplished within the scheduled period.
|