英文摘要 |
The project’s critical results of various work during its implementation period spanning from February 1, 2013 to December 31, 2013 encompass: a total of 337 fixed permeating source audits found to conform to the onsite audit work; corporate roadway adoptions of 24 enterprises; mysterious visitor’s non-coercive fuel vapor audit executions at 175 stations, totaling 318 cases, with 331 gas stations audited to meet the gas station law and regulations, and 4656 gas station handlers found with “correct ways of refueling”; the gas refueling gun vapor emission and refueling ratio (the vapor/fuel ratio) has a total of 1,515 refueling guns tested at 62stations; the fuel vapor pipework pressure deterioration leak (vapor leak) has 50 stations tested; vapor organic compound leak testing has 42 stations tested totaling 206 locations, the street permeating dust hosing work totals to 228,352km cumulatively, with a total achievement ratio at 100%, which as calculated according to EPA’s pollution reduction index derives a TSP reduction of 3,151 tons, PM10 at 599 tons, and of the street dirty level survey and grading work, the total survey length is at 4,634 km, of which level A roadways account for 80%, level B roadways 20% and level C roadways 2%. The plan has held two sessions of the fixed permeation law campaigning presentation and one session of Chief of Village assisted reporting mechanism campaign held at Daxin Cultural Center and Seaport Art Center; another gas station at Daya district office handling seed teachers training and three sessions each held at Environmental Protection Department conference room, offering various district teams with street cleaning-related orientation training.
|