“The“ 2014-2015 Stationary Source Permitting and Management Plan (SSPMP)” of Kaohsiung City was executed from 4th June, 2014 to the end of 2015. The missions included assisting Environmental Protection Bureau on examination of stationary source permitting, on-site permitting documents examination, on-site emission application investigation, on-line GHG application examination, flue monitoring works, flue VOCs fingerprints assessment, monitored-factories data base refreshment, non-monitored factories data base extending works and Cap controlled testing in industrial areas. In 2015, We finished 991 permit applications review and 812 permitting documents sent , and there were 2 productions' pollutions which need to hold expertise conferences to discuss. Besides, we also completed 1176 licenses check operation on site, 432 emission application examination, permitting sites monitoring, 10 times flue VOCs fingerprint assessment, 170 times public and private areas inspection, extended maintenance of database update for 1165 processes and refresh updating of 277 non-monitored factories. More than that, we also made each 2 conferences for explanation and technology transfer.
Until 2015, there are 1089 permitted factories with 1810 processes in Kaohsiung city. 432 factories of them have to report pollutant emissions by air pollution control act, 150 were belong to first group and 269 were second group, and 13 were dismissed control. We recognized 8996.977 metric tons of particulate matters, 26357.476 metric tons of SOx, 36942.185 metric tons of NOx and 11546.339 metric tons of VOCs in 2014. From 2014, the announcement had already been made that second group of GHG application online, and Kaohsiung City had 58 (18 were group 1, 40 were group 2). The plan already finished GHG application review from season 1 to season 3 of 2015, and transferred questionnaires and mistakes to applicants for fixing.
This year, the plan will cooperate with EPB to inspect informal factories, which were in the list provided by Economy Development Bureau, including metal production process and machining, totally 216 factories. Other issues included on-site inspection and reviewing process. The plan will continuously complete first stage of inspection from 24th to 26th, March, and collect results, in order to provide data for bureau to consider if stationary pollution permitting still needs to be controlled.
|
英文關鍵字 |
Stationary pollutant, permitting review, permittinpermitting document review, emission, monitoring, fingerprint analysis, retrofit, cap control, green house gas(GHG)
|