環境資源報告成果查詢系統

營建工程污染管制及查核計畫

中文摘要 本計畫執行自103年3月21日至104年2月28日止,主要工作重點為協助環保局加強辦理各項營建工地,管線、道路施工之稽、巡查管制工作,並將列管工地資料建檔管理,透過宣導資料發放及污染協商會,工地輔導之進行,加強工地對污染防範之認知,以落實污染改善之目的。 為提升環保局空氣污染防制工作執行績效,爭取環保署考核佳績,103年度營建工程排放量削減率達60.3%,TSP削減量4,177公噸,巡查排放量比率96.8%,巡查納管率77.9%,排放量抽查正確率100%,資料庫建檔品質100%,告發處分55件,告發改善完成率100%;EPA考評成績1.94分,達成率97%。 營建工程空氣污染防制費總申報件數計有4,267件,總申報金額為68,054,784元,今年度申報件數及申報金額為近年最高。 計畫執行期間,本計畫總計納管5,755處工地,累計巡查數達7,527處次,經由例行性巡查並將工地資料完成建檔外,且辦理5場次營建工地環保講習會議及8場次民眾宣導會,輔導44處營建工地執行道路認養,洗掃總長度達44,023.36公里,TSP削減達607.52公噸。推動工地大面積裸露地鋪設稻草蓆,總鋪設面積達24.2公頃,推估可削減TSP排放量達8.567 T/ha.yr。
中文關鍵字 營建工程、營建工程、逸散污染源、管制策略

基本資訊

專案計畫編號 YLEPB-103-007 經費年度 103 計畫經費 9612 千元
專案開始日期 2014/03/21 專案結束日期 2015/02/28 專案主持人 林宏斌
主辦單位 雲林縣環境保護局 承辦人 劉箕恩 執行單位 理虹工程顧問股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 103雲林營建_期末報告定稿本.pdf 19MB

Project of construction pollution control and inspection

英文摘要 This was which started in March 21, 2014 and ended in February 28, 2015. The primary objects are to give assistance with tighten up construction management business, including inspect and control of building sites, lay pipes and cables, and create governed construction sites information files for the EPB. By the methods, included publicity material, construction pollution conferences, construction site assistance, and educating the knowledge of pollution prevention to achieve the purpose of reduction pollution. To make every effort to raise performance results of air pollution prevention operation of the EPB and improve performance evaluation results from the EPA. The efforts are as follows. The rate of construction emission volume is 60.3%, and the volume of TSP is 4,177 tons. The rate of the emission inspection and governed inspection are 96.8% and 77.9%. The correct rate of spot-check for emissions is 100%, and the quality rate of database archiving is 100%. Construction site denounced sanctions are 55 cases, and improvement rate is 100%. The self-assessment results is 1.94 points, and achievement rate is 97%. The declarations of air pollution fee for construction are 4,267 cases and air pollution fees amounted to 68,054,784 N.T. dollars; the number of air pollution fees declarations of this year is highest in three years. The project implementation results are as follows. Governed construction sites are 5,755 places and the amount of inspection for building sites are 7,527 times; sites information collected during routine inspection was created files on schedule;5 construction site pollution consultations were held. Constructors (44 sites) were encouraged to join the adopt-a-road program. The street cleaning operation was completed 44,023.36 kilometers, and TSP volume was reduced 607.52 tons.
英文關鍵字 Construction, Fugitive Particulate Source, Control Strategies