環境資源報告成果查詢系統

103年度高雄市土壤及地下水品質監測及管理計畫

中文摘要 1.本市地下水污染潛勢採樣分析調查。 2.本市土壤品質及疑似土壤污染潛勢採樣分析調查。 3.本市境內轄區農地品質監測管制作業。 4.本市非法棄置場址地下水監測及污染調查公作。 5.本市後勁溪底泥之調查。 6.本市土壤、地下水或底泥之緊急應變作業。
中文關鍵字 土壤及地下水品質監測及管理

基本資訊

專案計畫編號 經費年度 103 計畫經費 6300 千元
專案開始日期 2014/09/17 專案結束日期 2015/09/16 專案主持人 林志恩
主辦單位 高雄市政府環境保護局 承辦人 蘇榮宏 執行單位 捷博科技股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 103計畫期末正式報告.pdf 32MB 103計畫期末正式報告

Quality Monitoring of Soil and Groundwater Contamination of Kaohsiung in 2014

英文摘要 The project content can be divided into 10 major items, such as following. 1.Soil and Groundwater Investigating Implemented 4 sites for Soil and Groundwater Sampling analysis;The Farm soil heavy metal was sampling contaminated to assessment for non-irrigating canal in Kaohsiung. 2.Soil and Groundwater Sampling Verifies Implemented 2 pollution control sites for Soil and Groundwater Sampling Verifies. 3.Regular Groundwater monitoring Implemented 88 groundwater monitoring wells sampling and analysis in 3 Industrial Area. 4.Repeal the Groundwater monitoring wells Repealed 11 groundwater monitoring wells. 5.Soil and Groundwater propaganda (More than 200 people) According the item of the first contract change, implemented a propaganda with Eco-Mobility 2017 on earth day. There were 327 people promoted by this propaganda. 6.Soil and Groundwater Campus propaganda (More than 50 people) According the item of the first contract change, implemented 5 Campus propaganda for Soil and Groundwater at May 2017. It including Jhong-Jheng Elementary school, Yue-Mei Elementary school, A-lian Elementary school, Nan-zi Elementary school, Chao-Liao Elementary school. There were 341 people promoted by propaganda. 7.Soil and groundwater representative dolls According the item of the first contract change, making with Soil and Groundwater or environmentally relevant representative puppets 2 sets, the dolls complete at June 2017. 8.Underground Storage Tank Regularly inspected and online declaration During the contract, to “Groundwater Pollution Preventing Facilities and Monitoring Equipment of Underground Storage tank”, implemented 72 Underground Storage tank inspected and online declaration. 9.Review the assessment of Articles 8 and 9 of the Soil and Groundwater Pollution Remediation Act During the contract, to “Articles 8 and 9 of the Soil and Groundwater Pollution Remediation Act”, reviewed 39 soil assessment reports. 10.Document Review Reviewed 4 reports by pollution improvement completion report, and provided preliminary review advice.
英文關鍵字 Soil、Groundwater、Industrial Zone