103年度臺南市營建工地污染管制查核計畫

中文摘要 計畫執行期間營建工程申報開工案件計有7,755件,申報開工案件的空污費徵收總金額為133,016,615元;至於施工工地數方面,扣除免徵、完工後申報與工程取消等工地數後,實際施工工地數為10,334處,其中經巡查納管共7,754處,納管率為75.03%;而工地TSP產生量總計為12,912.30噸,經污染管制後TSP排放量為5,158.97噸,污染削減率為60.05%。 在露天燃燒管制方面,共查獲422件稻作露天燃燒案件,主要集中於15時~18時此區間;而所查獲之總面積為114.66公頃,其中已燃燼面積為46.99公頃,滅火後未燃燒之面積為67.67公頃,滅火抑制率約為59.02%。另外並已推廣4個單位將「勿露天燃燒」條款納入契作合約,而總契作面積為1,170.22公頃,契作農戶共245位。 而裸露地清查作業部分,新增列管76處、總面積為56.06公頃,其中包含一般裸露地40.71公頃、河床裸露地15.35公頃;而改善作業方面則完成43處裸露地改善,改善面積為42.35公頃,其中包含一般裸露地27.17公頃、河床裸露地15.18公頃。 另外在相關宣導方面,除印製1,000份宣導手冊與發佈6則新聞稿外,另外也辦理2場次營建宣導說明會與2場勿露天燃燒宣導說明會,並針對相關污染嚴重或重大工地召開5場次小型宣導說明會。
中文關鍵字 營建工地污染管制查核計畫

基本資訊

專案計畫編號 EPB-103-AN-31-218 經費年度 103 計畫經費 18068 千元
專案開始日期 2014/02/12 專案結束日期 2015/02/11 專案主持人 王應堂
主辦單位 臺南市政府環境保護局 承辦人 呂政霖 執行單位 堃捷工程股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 全文.pdf 72MB

2014 Tainan City’s Construction sites Management and Inspection Project

英文摘要 “2014 Tainan City’s Construction sites Management and Inspection Project” (the project) , which executed from January to December, 2014(the period), is a continuing project carried out the past years’ rountin on inspecting the construction sites and promoting latest relvent regulations. During the period, there were 7,755 new construction sites decleard the Air Pollution Control Fees, collected total amout of NT$ 133,016,615 . One of major target in the project is reducing the TSP emission by inspecting sites’ air pollution control facilities. The estimated TSP emission of 10,334 sites that under contstution was 12,912.30 tons. Through the project’s managment, 7,754 construction sites were inspected, the control rate was 75.03%. The actual TSP emission downed to 5,158.97 tons, and thus the average reducing rate was 60.05%. Rice is the major agriculture product of Tainan city, but the traditional open-burning caused air pollution after harvest season. For this reason, the project made “Non-Open-Burning Article” agreement with 245 contracted farmers among 4 rice manufacturing associations, total rice paddy reached 984 hectares. However, there were still 442 sites occurred open-buring mainly during 3pm-6pm, burning area were 46.99 hectares. The project’s members assisted to put out fire on 67.67 hectares, the control rate was 59.02%. Moreover, the project conducted the Barren Land Investigation & Consulting Improvement, which discoverd 76 barren lands, total of 56.06 hectare, including 40.71 hectare of normal barren land and 15.35 hectate of river barren lands. On the other sector of Consuling Improvement, there are 43 uncover-suface sites improved under the project consulted, the improving area are 42.35 hectare, including 27.17 hectare of normal barren land and 15.18 hectate of river barren lands. In oreder to promote the importance of air polloution control with latest government regulation. The project held 2 explanatory conferences for general construction sites, 2 “Non-Open-Burning” explanation session, 5 explanatory session to those sites which were heavy polluated or listed under major construction sites , and published 6 news.
英文關鍵字 Tainan City’s Construction sites Management and Inspection Project