英文摘要 |
This year, the project continued on cleanup site verification, procedure revisions, and IDMS enhancement. It also helped regulate the list of responsibilities for a site owner. With respect to the emergency responses for minimizing the accidental pollution, the project established the procedures of initiating emergency responses for illegal disposal events. The project also established the ranking and the ranking mechanism for the illegal disposal site classification.
With respect to the site cleanups, up to April 30th, 2014, there were 420 listed site in the IDMS. 202 out of the 420 sites were delisted later and 218 of them were still in the list. Within the 218 sites, 61 of the newly listed sites, which included abandoned barrels and sludge, were visited and the site visit records, site history, system errors, and cleanup cost estimates were conducted. In November, 2014, the related local environmental protection bureaus were visited to verify the progress of the cleanup and administrative measures.
As for the peripherals of the Resource Recycling and Reuse Law (Draft), the project drafted the necessary responsibilities of a site owner into law. In order to diminish the pollution, the Law added the response measures of an emergency reaction. The project referenced the past cases and the related environmental regulations to draft the measures. Besides, it also established the site ranking and ranking mechanism based on the HRS classification and IDMS operations. The system has been applied on the No. 228 site in Taichung, the No. 385 site in Tainan, the No. 353 site in Tainan, and the No. 429 site in Yuenlin County.
In addition, this project also drafted 2 regulations regarding cleanup operation procedure for private lands and enlisting and delisting of illegal waste disposal cases. 32 consultation and legal services were provided. 4 attendances of information reply, meeting attendance, and presentation requested by the Control Yuan. 18 duck farm visits were conducted.
|