英文摘要 |
The plan for the implementation of the New Taipei City air quality, noise,
indoor air quality and other designate air quality monitoring test
operation ,due to the increasing complexity of work content, in addition to
routine monitoring, indoor air quality policy went into effect. Execute
inspection for all the first batch management sites, where inspectors to
ensure the industry to comply with indoor air quality regulations, give people
a healthy living environment.
For monitoring air quality project, monitoring the mean concentration of
TSP monthly between18~70 μg/m3 this year .Municipality within 22/33 dust
station monitor once a month, every station should set up 30 ± 3
days.Monitoring results show the concentration of dust averages
between3.55~7.97 ton / km / mon from 105.01 to 105.12.
The air quality monitoring, this project monitored San-Xia northern region、Shulin
incineration plant and other areas designated by the EPA,23times of air quality
testing monitoring stations.
About the monitoring of fixed noise, this results show that the equivalent
energy sound level of traffic noise station failed 4 of 45 periods ; the
equivalent energy sound level of environmental noise station failed 13 of 45
periods,continuous monitoring of subsequent failure to observe the area.
Specify noise monitoring were petitioned by citizens and were implemented
after they were assigned by the EPB, total of 28 petitions noise monitoring. If
monitoring results exceeding standards were enforced subsequent processing
due to noise control ordinance.
In regard to monitoring motor vehicle noises, the EPB assist by the project will
have issued a document to the people who have been petitioned, and these people are to
undergo testing of their vehicle’s noise levels at a designated time and location. This
project is also monitoring motor vehicle noises by roadside with the New Taipei City
police that mainly for the occasional racing section held to prevent young people to
modify the vehicle.
Indoor air quality is one of the focuses of the program. This project will
hold seminars of indoor air quality self-management advocacy, monitoring of
30 points and counseling of 80 points. Execute inspection for all the first
batch management sites
Other work items about the non-ionizing have been executed radiation
monitoring 66 times, the relevant monitoring results and photos have been uploaded
to the Environmental Protection Bureau website. this plan, relevant monitoring
results and photos have been uploaded to the EPA website. Monitor traffic
flow monthly with Shulin incineration plant EIA to understand the traffic
situation in this area.
Therefore, every month before the 10th, the monitory test results are
uploaded onto the relative website, so that the general public and academic
units are able to easily look them up.
|