104年度臺南市營建工地污染管制查核計畫

中文摘要 計畫執行期間營建工程申報開工案件計有6,791件,申報開工案件的空污費徵收總金額為120,521,427元;至於施工工地數方面,扣除免徵、完工後申報與工程取消等工地數後,實際施工工地數為10,617處,其中經巡查納管共7,590處,納管率為72%;而工地TSP產生量總計為10,795.94噸,經污染管制後TSP排放量為4,211.48噸,污染削減率為60.99%。 在露天燃燒管制方面,共發現437件稻作露天燃燒案件,主要集中於16時~19時此區間;而所查獲之總面積為112.21公頃,其中已燃燼面積為37.13公頃,滅火後未燃燒面積為75.08公頃,滅火抑制率約為66.91%。另外並已推廣4個單位將「勿露天燃燒」條款納入契作合約,而總契作面積為1,208.9公頃,契作農戶共297位。 而裸露地清查作業部分,新增列管70處、總面積為65.3公頃,其中包含一般裸露地38.52公頃、河床裸露地26.78公頃;而改善作業方面則完成33處裸露地改善,改善面積為36.34公頃,其中包含一般裸露地17.18公頃、河床裸露地19.16公頃。 另外在相關宣導方面,發佈10則新聞稿外,另外也辦理4場次營建宣導說明會與9場勿露天燃燒宣導說明會。
中文關鍵字 104年度臺南市營建工地污染管制查核計畫

基本資訊

專案計畫編號 EPA-103-L001-31-208 經費年度 104 計畫經費 16810 千元
專案開始日期 2015/02/12 專案結束日期 2016/02/11 專案主持人 王應堂
主辦單位 臺南市政府環境保護局 承辦人 呂政霖 執行單位 堃捷工程股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 全.pdf 46MB

2015 Tainan City’s Construction sites Management and Inspection Project” (the project)

英文摘要 “2015 Tainan City’s Construction sites Management and Inspection Project” (the project) , which executed from Feb,2015 to Feb,2016(the period), is a continuing project carried out the past years’ rountin on inspecting the construction sites and promoting latest relvent regulations. During the period, there were 6,791 new construction sites decleard the Air Pollution Control Fees, collected total amout of NT$ 120,521,427 . One of major target in the project is reducing the TSP emission by inspecting sites’ air pollution control facilities. The estimated TSP emission of 10,617 sites that under contstution was 10,795.94tons. Through the project’s managment, 7,590 construction sites were inspected, the control rate was 72%. The actual TSP emission downed to 4,211.48 tons, and thus the average reducing rate was 60.99%. Rice is the major agriculture product of Tainan city, but the traditional open-burning caused air pollution after harvest season. For this reason, the project made “Non-Open-Burning Article” agreement with 297 contracted farmers among 4 rice manufacturing associations, total rice paddy reached 984 hectares. However, there were still 437 sites occurred open-buring mainly during 4pm-7pm, burning area were 37.13 hectares. The project’s members assisted to put out fire on 75.08 hectares, the control rate was 66.91 %. Moreover, the project conducted the Barren Land Investigation & Consulting Improvement, which discoverd 70 barren lands, total of 65.30hectare, including 38.52 hectare of normal barren land and 26.78 hectate of river barren lands. On the other sector of Consuling Improvement, there are 33 uncover-suface sites improved under the project consulted, the improving area are 36.34 hectare, including 17.18 hectare of normal barren land and 19.16 hectate of river barren lands. In oreder to promote the importance of air polloution control with latest government regulation. The project held 4 explanatory conferences for general construction sites, 9 “Non-Open-Burning” explanation session, and published 10 news.
英文關鍵字 2015 Tainan City’s Construction sites Management and Inspection Project” (the project) , which executed from Feb,2015 to Feb,2016(the period), is a continuing project carried out the past years’, 2015 Tainan City’s Construction sites Management and Inspection Project” (the project) , which executed from Feb,2015 to Feb,2016(the period), is a continuing project carried out the past years’