金門縣移動污染源稽查管制計畫

中文摘要 本年度『移動污染源稽查管制計畫』執行期程自105 年3 月4 日至106年3 月3 日止,主要針對機車排氣路邊攔檢、未到檢機車動態車牌辨識、訪查、巡查、定檢站查核、即時傳輸系統管理、定檢檢驗通知單寄發、充電站 巡查、柴油車路邊及場站攔檢、油品檢驗、目視判煙、烏賊車案件處理、宣導活動之舉辦,以及其他業務相關宣導及行政工作等進行規劃執行,而截至106 年2 月20 日止,各項工作執行如下: (一) 機車稽查管制作業 1.機車攔檢作業,目標數1,000 輛次,已完成機車排氣路邊攔檢1,015 輛次,檢測不合格139 輛次,檢測不合格率13.7%,其中122 輛檢測不合格車輛完成複驗,複驗率87.8%。 2.機車車牌辨識作業,通知數量需達800 輛次,配合巡查作業,回檢量共需達3,000 輛次。已完成機車車牌辨識定點稽查11,628 輛次,並寄發附照片之定檢通知書904 輛給車主,回檢車輛有783 輛次,回檢率86.6%。 3.機車巡查作業,目標數2,200 輛次,已完成巡查作業2,462 輛次,截至106 年2 月20 日止,回檢數有1,852 輛次,回檢率75.2%。 4.機車訪查作業,篩選本縣103 年度起迄今未定檢機車數,目標數500 輛次,完成訪查作業500 輛次。 (二) 柴油車稽查管制作業 1.柴油車路邊攔檢作業,目標數200 輛,已完成柴油車路邊攔檢258 輛次,檢測不合格12 輛次,檢測不合格率4.65%。 2.柴油車路邊攔檢抽油作業,目標數40 瓶,已完成柴油車路邊抽油40 瓶,送驗結果皆合格。 3.柴油車場站檢測作業,目標數800 輛,完成柴油車場站檢測805 輛次,有58 輛不合格,檢測不合格率7.2%。 4.柴油車場站檢測抽油作業,目標數30 瓶,已完成柴油車場站抽油30 瓶,送驗結果皆合格。 5.完成柴油車目視判煙合格840 輛次,不合格31 輛次,已通知到檢,目前完成19 輛次完成複驗,8 輛通知中,4 輛審查中,複驗率61.3%。 6.追蹤已簽署自主管理車輛是否確實執行車輛維修保養,以確實監督車輛狀況,目標數為600 輛次,截至106 年2 月20 日,已追蹤保養車輛1,062輛次。 (三) 怠速熄火稽查管制作業 1.停車怠速熄火稽查作業,目標數200 輛,已完成稽查宣導200 輛次。 2.停車怠速熄火勸導單開立,目標數10 輛,使用紅外線熱像儀(FLIR)作為停車怠速熄火查核儀器,已完成勸導單開立10 輛。 (四) 宣導相關作業包括計畫製作宣導手冊文宣4,000 份及宣導品2,500 份,目前皆已完成,並已舉辦2 場次說明會、5 場校園宣導、20 場監理站排氣定檢宣導、10 場次村里移污相關檢驗或宣導活動及新聞發佈3 則。 (五) 定檢站定期查核作業於計畫開始執行後,每月完成每站1 次查核,並每月不定期查核本縣定檢站至少1 站,包含缺失複查、實車測試、人員及管制性耗材等。目前共完成84 站次之例行查核及14 站次不定期實車查核。 (六) 針對縣內各鄉鎮設立之65 座電動機車充電站,每月進行巡查維護工作一次,目前已完成12 次780 站次之巡查維護。 (七) 辦理檢驗人員教育訓練說明會1 場次,邀集環保署長官、定檢站業者、服務站代表,共同討論定檢業務工作執行,以及透過多元化教育訓練課程內容安排等,強化定檢站檢測之品保品管,;此外,並辦理計畫執行人員在職教育訓練,共4 場次。 (八) 定期寄發本縣轄內機車定檢檢驗通知單,依機車發照月份共計完成定檢通知寄發36,859 件,逾期未定檢機車再以二次通知檢驗,共計二次定檢通知寄發16,387 件,以加強提升定檢到檢率。 (九) 配合環保署實施未定檢機車禁止換發行照措施,修改新增既有之寬頻即時系統部份設備及功能,除即時與本縣定檢站以ADSL 連線收取即時檢驗資料外,並定期維護更新定檢站專區及民眾專區定檢資訊網頁,作為與定檢站訊息交流的空間,提供最新的定檢相關資訊,建立便民服務的基礎。 (十) 計畫本期完成比率:100.0%。
中文關鍵字 移動污染源稽查管制

基本資訊

專案計畫編號 Kepb105-04 經費年度 105 計畫經費 6250 千元
專案開始日期 2016/03/04 專案結束日期 2017/03/03 專案主持人 林章文
主辦單位 金門縣環境保護局 承辦人 陳邦鴻 執行單位 新研綠能科技有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 105金門移污期末報告(定稿本)20170320.pdf 6MB

Migration Pollution Source Inspection Control Program

英文摘要 "2016 Migration Pollution Source Inspection Control Program" hadbegun from Mar.-4-2016 to Mar.-3-2017. Its major items wereinspecting motorcycle emission on the roadside, identifying thelicense plate for un-inspection motorcycles, visiting motorcycles,patrolling inspection, checking inspection stations, updatingtransmission in-time system, delivering inspection notifications,patrolling charge stations, inspecting diesel vehicle smoke, spot checking oil ingredients, visual judgment of diesel vehicles smoke emission, dealing with the cases of smoked vehicles and held the campaigns of guidance, etc. Till Feb., 20, 2017, perform the work as follows: 1. Motorcycles inspection (1) Target number is 1,000 cases; this project has completed 1,015 inspections on the roadside. There were 139 disqualifications, the rate of disqualification was 13.7%, in which there were 122 cases that has finished inspecting, and the rate of re-inspection is 87.8%. (2) In the tasks of the identification system, target number is 800 cases; this project has completed delivered 904 inspection notices with pictures for those non-inspection vehicle owners, in which there were 783 motorcycles inspected. The rare of participation was 86.6% in this task. (3) In the task of patrolling non-inspection motorcycles on the roadside, target number is 2,200 cases; this project has completed 2,462 cases, in which there were 1,852 cases inspected; the rate of participation was 75.2% in this task. (4) In the task of visiting motorcycles, screen vehicles registered data for the non-inspection vehicles until now. Target number was 500; this project has completed 500 cases. 2. Diesel vehicles inspect and control (1) In the tasks of spot check, target number 200 cases, this project has completed 258 cases, there were 12 cases unqualified and the rate of unqualified was 4.65%. (2) In the tasks of diesel vehicles oil inspection on the roadside, this project pumped 40 bottles of oil on the roadside, they were inspected by impartial inspection company, the result were qualified. (3) In the tasks of inspection in the diesel vehicles inspection station, target number was 800 cases. This project has completed 805 cases, in which there were 58 cases unqualified, the rate of disqualification is 7.2%. (4) In the tasks of oil inspection in diesel vehicle inspection station, target number was 30 bottles, this project pumped 30 bottles of oil, and all of them were qualified. (5) In the tasks of visual judgment of the smoky diesel vehicles, this project completed 840 cases qualified, and 31 cases unqualified, which were notified to check. So far there are 19 cases inspected. (6) Follow-up survey for those vehicles which has signed self-management and to know whether they carry out a regular maintenance. Target number was 600, has completed 1,062 cases. 3. The idling-stop control operation inspection (1) Motor Vehicle Parking and Idling inspection operations, target number was 200, this project has completed 200 vehicles. (2) Writing idling-stop warning tickets, target number was 10, this project has completed written 10 warning tickets by using the infrared thermal imager (FLIR). 4. In the tasks of promotion, this project made 4,000 handbills and 2,500 gifts. Moreover, this project held 8 promotions, 5 campus propaganda, 20 Motor Vehicle Supervision Office promotions, and 10 village propaganda. This project also publishing 3 news. 5.In the tasks of period inspection, its inspection item included review, on-site inspections by riding motorcycles, inspectors, consumables etc. this project has completed 84 routine inspections and 14 on-site inspections by riding motorcycles. 6. In the tasks of charge stations, this project completed 12 times and 780 stations patrolled for 65 electric scooter charge points. 7. In the tasks of education and coordination, in order to enforce inspection stations’ QA&QC, this project held 1 education training seminar and invite EPA officials, inspection station owners, scholar, and experts to discuss the period inspection jobs and educations training lessons etc. Moreover, this project held 4 education training meeting. 8. In the tasks of notices of motorcycle period inspection, this project has completed delivering 36,859 postcards and 16,387 second-notice postcards for those which didn’t finish inspection motorcycles within the specified time. 9. In the tasks of broadband transmission system, receive in-time inspection data, maintain and updating website, provide the latest inspection information to the people. 10. The rate of completions is 100%.
英文關鍵字 Migration Pollution Source Inspection Control