英文摘要 |
Indoor Air Quality Project was started on 5 May 2016. The project scopes included perform indoor air quality(IAQ) measurement and site visits at public indoor area of Yunlin, provide preliminary corrective advice and planning, update new indoor air quality regulations, suggest new monitoring target places and keep promoting the importance of indoor air quality. A series (9 tests in total) of standard indoor air quality measurements were performed at 45 indoor area of Yunlin’s public building. The degrees of compliance of indoor air quality regulations at each public area were summarized. A systematic indoor 8 points/times continuous carbon dioxide monitoring was completed in public buildings. To provide management plan in different scenarios and monitoring result logging, A set of Indoor Air Quality Direct reading instrument has been Purchase. Plan to maintain the indoor air quality information page and update the information. 5 numbers of IAQ counselling workshops have been completed in order to assist in air quality improvement at public indoor area. In order to determine the reason of unsatisfied result, an additional long air quality sampling would be carried out at the point. In order to promote the importance of indoor air quality, it organized conferences and prepared promotion items. The project achievements at the end of the season were summarized as below:
1) Indoor air quality measurement and site visit has been completed for 66 points which included 51 general in public place and 15 announcement in public place (included the list of second draft). Preliminary corrective advice has been provided to the place with poor IAQ.
2) Indoor air quality monitoring and pollutant analysis have been performed for 45 points/times. Part monitoring results were incomplied with indoor air quality standard. which included Cihtong Township Library, Dounan Township Library, Huwei Township Library, National Taiwan University Hospital Yun-Lin Branch Douliu Region.
3) 8 points/times of continuous indoor carbon dioxide monitoring were completed at public area in order to determine the degree of compliance of IAQ standard.
4) A set of Indoor Air Quality Direct reading instrument has been Purchase.
5) 6 numbers of IAQ counselling workshops have been completed in order to assist in air quality improvement at public indoor area.
6) Has been on 9 Sep 2015 to the China Medical University Beigang Hospital for air conditioning ventilation simulation and indoor air quality inspection and continuous monitoring, through the mapping and other staff and indoor and outdoor analysis of the amount of carbon dioxide, The complete improvement report provides the site to be improved.
7) Conferences related office IAQ have been completed 2 times. It mainly focused to the monitoring sites of this year and introduce of indoor air quality regulations. One conference of various government departments was completed.
8) 500 set of leaflets and other promoting items were designed and prepared. They would be delivered to public and persons in charge during the site visit and conference.
9) The implementation of inspection equipment maintenance operations, for the inspection program used in the direct reading of indoor air quality testing equipment, regular correction and maintenance operations.
10) With the Education Department to carry out indoor air quality testing operations for sports venues, and to coordinate with the Evaluation of EPA.
|