"105 years from stationary sources audit control plan", under the supervision of the Executive Council, in addition to efforts to achieve quantitative targets, and sophisticated controls effectiveness in substance, to reach the desired objectives. 105 years expiring December 31, the Abstract the results of this project are described below.
1. During the execution ending December 31, accepting the license application case 15 to complete 11 to review the case of a job application.
2. During the execution ending December 31, completed 39 meter license check, in addition to Yu Chau Industrial Co., Ltd. M01 asphalt manufacturing process damaged the old boiler has been removed, and the license does not match the external content are consistent with the license. License Check coincidence rate of 95%. Check the compliance rate of 95% of the annual pollution prevention book> 90% of the control objectives.
3. During the implementation period, as at 31 December 2016, 80 379 fixed-source inspections were carried out. According to the frequency of inspection, the highest frequency of ready-mixed concrete manufacturing (90) times, followed by oil and (60), the power industry (39), the lowest for other plastic products manufacturing, baking cooking steamed food manufacturing, defense and fruit and vegetable processing and preservation (4), the main With the strengthening of sand and gravel piling control operations to strengthen the inspection, with high frequency of inspection to reduce the situation and pollution incidents.
4. Fourth, the cause of the tube 94, a total of 98 rows of fixed sources of pollution inventory operations.
5. Fifth, the completion of the first quarter of 105, 105, the second quarter of 105 and 105 third quarter of the air pollutant emissions report review operations, the cumulative amount of air pollutants reported emissions of 51.711 metric tons of particulate matter, sulfur oxides 483.955 Metric tons of nitrogen oxides, 1056.627 metric tons of volatile organic compounds, 252.703 metric tons of volatile organic compounds.
6. This year the inventory of the main harmful volatile organic matter is toluene, dimethyl stupid, benzene and other three pollutants, individual pollutants emissions of toluene 551.29 kg, xylene emissions 304.25 kg and benzene 1,588.55 kg.
7. This year, the "105 Air Pollution Emergency Response Training" was held on July 27 this year.
8. This year the implementation of the fourth quarter of fiscal year 2015 air pollution charges,2016 year, the first quarter to the third quarter of the sewage charges to declare the operation,The total amount of 12,687,970 yuan collection, the use of network system to declare 100% and air pollution charges to 100%.
9. During the implementation period, a total of 95 inspections were conducted on 31 December, with a total compliance rate of 40%.
10. During the implementation of the statistics until December 31, a total of 24 days, a total of 104 times to intercept, all the inspection of sand and gravel vehicles are set sprinkler facilities to ensure that the bucket loaded sand and gravel to keep wet, The occurrence of the situation.
11. The county has 16 industry operators signed a self-management commitment, the implementation of pollution control measures and the surrounding road through a total of 785.4 kilometers of road operations, washing street 407.4 kilometers, the total length of 1,192.8 kilometers, the estimated reduction of TSP amounted to 16.46 Metric tons, PM10 cut of about 3.125 metric tons, PM2.5 reduction of about 0.724 metric tons.
12. Performed five times a year, testing operations, each time contain particulate matter, SOx and NOx detection, the flue sampling analysis section, the test results are in line with emission standards.
13. Completed 7 times the fixed pollution source perimeter TSP detection operations.
14. Implementation of the construction machinery engine using liquid fuel sampling 30 sub-inspection and testing operations, are in line with specifications.
15. During the implementation of the program has been completed 7 stations gas leak detection operations.
16. The implementation of continuous automatic monitoring facilities function check 1, 3 times RATA functional test, test results in line with management practices.
17. During the implementation of the program, the handling of three sessions of fixed air pollution regulations related to publicity.
18. During the implementation of the program to submit two monthly press releases, a total of 20 Environmental Protection Agency press release.
19. We set up monitor for automatic washing table of gravel terminal this year We watch from time to time whether we carry vehicle after automatic washing machine to clean body. Continue to carry out interception operations for gravel vehicles, the monthly cooperation with the gravel ship into the gravel terminal to strengthen the promotion of gravel vehicles through the automatic washing station facilities to clean the body, to avoid the vehicle from the pier caused by sediment dragging pollution Yu.
|