105-109年度新竹市清潔車輛裝置濾煙器運行維護計畫
中文摘要 | 新竹市環境保護局著眼於空氣品質改善與移動污染源管制,特規劃辦理「105-109年度新竹市清潔車輛裝置濾煙器運行維護計畫」降低柴油車廢氣污染排放、增進政府形象並改善民眾觀感,針對本市老舊垃圾清潔車輛加裝濾煙器,進行12套濾煙器租賃安裝工作,以期改善柴油車造成污染問題,並於執行期間執行實車測試,驗證濾煙器效能、耐久及減量效益。本計畫成果為:安裝濾煙器車輛名單篩選及配對,可安裝濾煙器之車輛總計為26輛,另於安裝前完成24輛煙度檢測及調修保養21輛,依據安裝前污染度與調修保養結果,篩選優先安裝濾煙器名單,並自105年5月4日至105年7月30日完成安裝濾煙器,安裝濾煙器後污染去除率達97%至100%,平均去除率達99%;而安裝濾煙器前後車輛實測之馬力比差異均未降低超過10%,自105年8月至109年12月份完成53次維護保養工作,期間推估每年PM2.5削減量推估為0.0863噸,TSP削減量推估為0.0938噸,執行期間辦理20場次教育訓練確保車輛使用者能定期執行自動再生作業。 | ||
---|---|---|---|
中文關鍵字 | 105-109年度新竹市清潔車輛裝置濾煙器運行維護計畫 |
基本資訊
專案計畫編號 | 10402084 | 經費年度 | 105 | 計畫經費 | 5280 千元 |
---|---|---|---|---|---|
專案開始日期 | 2016/01/04 | 專案結束日期 | 2020/12/31 | 專案主持人 | 宋鏶方 |
主辦單位 | 新竹市環境保護局 | 承辦人 | 呂理斌 | 執行單位 | 永續綠能科技股份有限公司 |
成果下載
類型 | 檔名 | 檔案大小 | 說明 |
---|---|---|---|
期末報告 | 本文.pdf | 16MB | 正式研究報告 |
105-109 Hsinchu City Clean Vehicle Installation Smoke Filter Operation and Maintenance Plan
英文摘要 | The Hsinchu City Environmental Protection Bureau focuses on air quality improvement and mobile pollution source control. It plans to implement the "105-109 Hsinchu City Clean Vehicle Installation Smoke Filter Operation and Maintenance Plan" to reduce diesel vehicle exhaust emissions, enhance government image and improve public perception , For the city’s old garbage cleaning vehicles to install smoke filters, 12 sets of smoke filter rental installation work, in order to improve the pollution caused by diesel vehicles, and during the implementation of the implementation of vehicle tests to verify the effectiveness, durability and Reduction benefit. The results of this project are: screening and matching the list of vehicles with smoke filter installed. The total number of vehicles that can be installed with smoke filter is 26. In addition, 24 vehicles have been tested for smoke level and 21 vehicles have been repaired before installation, based on the pollution level before installation. According to the maintenance results, the list of priority installation of smoke filters was screened, and the installation of smoke filters was completed from May 4, 105 to July 30, 105. The pollution removal rate after the installation of smoke filters reached 97% to 100%. The average removal rate is 99%; and the difference in horsepower ratio measured before and after the installation of the smoke filter has not been reduced by more than 10%. From August 105 to December 109, 53 maintenance tasks were completed, and the annual PM2.5 was estimated during the period. The reduction amount is estimated to be 0.0863 tons, and the TSP reduction amount is estimated to be 0.0938 tons. During the implementation period, 20 training sessions are conducted to ensure that vehicle users can regularly perform automatic regeneration operations. | ||
---|---|---|---|
英文關鍵字 | 105-109 Hsinchu City Clean Vehicle Installation Smoke Filter Operation and Maintenance Plan |