The main contents of the project include: inspection of not scheduled inspection car, set the rate of upgrading operations, low-pollution vehicle promotion, inspection station management, new and existing charging station maintenance operations and training activities, etc., the work summary One show. The statistical period for the reporting period is from February 16, 2016 to February 15, 2017, and the results of the monthly performance of the work are shown in Table 2.
The project is required to inspect 70,000 vehicles without inspection vehicles, and the total number of unqualified vehicles is 70,026 vehicles, which are certified by the license plate identification system 63,822 and 6,204 of the roadside inspections, as of February 15,2017.
During the period of the plan, 90,000 postcards will be sent to the postcards, and the number of postcards will be sent from February, 2016 to January, 2017 with a total of 924,846 copies to complete the work objectives. Reminders to send 280,000, to complete the delivery of 280,122 inspection notice, the monthly number of notifications are up to 13,000 or more.
Mobile fixed inspection car empty area service, the planned number of targets for 550 times, statistics to January, 2017 total detection of 558 vehicles, to achieve the intended target. Two-way locomotive irregular roadside operations This year is required to complete 5,000 vehicles, a total of 5,076 vehicles to complete the scheduled work objectives.
The results of the case: the case notice notice rate of 99.52%, the case should be punished 100.0%, the case for the time limit of 5, 22, bonus and prizes issued rate of 100.0% and bonus payment time of 5.8 days.
To assist the Environmental Protection Agency to handle the phase-out of motorcycles with the two-stroke engine and purchase of new low-pollution vehicle subsidies, from the date of subsidies until December 31, 2016 , accepted the two out of two locomotives subsidy cases a total of 45,288 cases, the number of accepted more than 2 times in 2015.
TNEPB set up a total of 202 electric locomotive charging stations, the program must be completed once every six months maintenance operations, including the people of the repair of the charging station, a total of 424 times to complete the maintenance of electric locomotive charging stations, and for 16 LOGO damage and 4 stations are not set up LOGO to be repaired and updated.
In order to maintain the inspection quality of the inspection station, this year, it is necessary to check and check the station of 744 stations on a regular basis and check 100 stations from time to time and perform 250 checkpoints and gas checkpoints at the end of the year. By the end of January, 2017, check and check the station 744 times, from time to time check 137 stations, real car check 258 stations and gas check 80 stations, complete the scheduled work objectives.
During the planning period, the station is easy to idle at the station, the main sections, the high-speed railway station and the bank, and perform the idle operation to stop the operation. The total number of 1,545 vehicles will be persuaded. The vehicles will be stalled or departed from the court. And set the parking lot on the easy location of the jurisdiction of the parking lot, but also with the Education Bureau to promote two zero-speed demonstration schools, respectively, tainan municipal dongshan district Ka-Bua Sua elementary school and tainan municipal Jiangjyun district Jiangjyun elementary school.
|