英文摘要 |
Taoyuan City, the number of fixed sources of pollution 2,545, which are based on the Environmental Protection Department's "Fixed Air Pollution Source Management Information System". Fixed pollution sources Pollutant emissions statistics included particulate contaminants 2,944 ton/year, sulfur oxides 5,542 ton/year, mitrogen oxides 14,034 ton/year, volatile organic compounds (VOCs) 24,303 ton/year .
The execution of the project was scheduled from 2016/03/24 to 2017/03/23 with a total of 12 months. The progress in implementation of each individual work, included the control of VOCs, pollution reduction, inspection of factories, pollution control of Taoyuan refinery of CPC corporation, supervision of periodic detection & online reporting review, renewal or maintenance of CEMS for compliance with CEMS regulatory, and handling regulatory seminars etc., were executed according to the schedule of the project. All the progress of the work complied with the contract requirements, the abstract of achievements were shown in table 1.4-1.
The key works of the project in this year are including:
(一). The control of volatile organic compounds(VOCs):
1. There are 230 special manufacturers, the overall reporting and review rate of 100%.
2. Since 100 years with the Environmental Protection Agency industry special project control,105 annual implementation of the "automotive coating industry" on-site inspection and tracking 104 years of PU synthetic leather industry 14 pollution improvement progress.
Completion of the five auto plant tax statements compared with the 104 annual reporting data, only Shunyi car has a significant gap (omission of paint consumption 6.2 ton/year), other depots no significant difference. The other PU synthetic leather industry has 5 complete process area enclosed gas and regenerative incinerator set, VOCs reduction 581.20 tons / year.
3. Completion of 280 station gas station inventory and regulatory compliance check operations, after inventory of VOCs emissions of 653.9 tons. Another completion of 62 stations A/L ratio test, 142 failed to improve the completion of the reduction of 47.81 tons / year, the overall A/L ratio of 85.1%.
4. In the fourth quarter of 2016, 502,184 device components were declared,
The implementation of Nectarine refineries and other petrochemical industry a total of 3,035 equipment components inspection and testing,
Two of these leaks are greater than 10,000 ppm, according to violation of air pollution control regulations Article 20 of the incident and require improvement.
5. Pollution control of Taoyuan refinery of CPC corporation : 8 hydrocarbon (HC) ground flare started from 105/01/01 FGRS system recovery process exhaust gas to fuel gas system and three hydrogen sulfide combustion towers completed in 103/5 full improvement to sulfur plant recycling, 105 years of use for 3 days,compared to 104 days of use 325 days (FGRS system is not start up before), the use of emissions days decreased by 99%;Statistics 105 years 8 carbon hydrocarbon combustion tower waste gas flow total recovery 19117KNm3 as a system fuel used,The overall reduction of SO2 by 276.7 ton/year, VOCs reduction of 58.4 ton/year. Popular petitions, there are total of 14 air pollution petitions in 2015.
(二). CEMS regulatory: The 15 CEMS inspections are completed and after counseling, the pass rate is 100%. In addition, the 20 RATA inspection are also completed, and comparison of the data between manufacturers' RATA and during the investigation period, the mean value within 72Hr is not greater or smaller than the 3 times standard deviation, the all data quality are good.
(三). Inspection of stationary pollution sources:Discharge pipeline inspection to complete the completion of 30 samples, the failure rate of 47%. People complained inspection and testing completed 20 samples, the failure rate of 10%.
(四). Fixed source and control equipment monitoring and management operations: 105/6/16 issued "Taoyuan City, fixed pollution and control equipment, monitoring and management of self-regulation regulations", 106/11/30 the completion of the connection. Assist the EPB in providing examples of Set up Plan to counsel the industry. At present, 75 have been submitted to 71 review, is expected before the end of March to complete the application of the program book. The other test before the trial 9 factory monitoring connection operation daily data inspection results effective transmission rate of more than 95%.
The relevant contents in details will be presented in the upcoming sections.
This project extended the investigation in 2015, and remain committed to synchronously combined with advanced instruments for inspection and counseling task. To strengthen the abilities of inspection, based on charging overdue air pollution fee as the incentive for counseling. It can feedback the real pollution situation and implement the licensing system to reach the goal of the 2016 Taoyuan city pollution control project in NMHC reduction.
|