雲林縣105年度營建工程污染管制及查核計畫

中文摘要 本計畫執行自105年3月22日至106年3月21日止,主要工作重點為協助環保局加強辦理各項營建工地,管線、道路施工之稽、巡查管制工作,並將列管工地資料建檔管理,透過宣導資料發放及法令宣導說明會之進行,加強工地對污染防範之認知,以落實污染改善之目的。 為提升環保局空氣污染防制工作執行績效,爭取環保署考核佳績,105年度營建工程排放量削減率達61.65 %,PM10削減達1,088.33公噸。 營建工程空氣污染防制費總申報件數計有3,660件,總申報金額為39,325,010元。 計畫執行期間,本計畫總計納管5,183處工地,累計巡查數達7,275處次,經由例行性巡查並將工地資料完成建檔外,且辦理3場次營建工地法令宣導說明會議及8場次民眾宣導會,輔導50處營建工地執行道路認養,洗掃總長度達29,029.02公里,PM10削減達75.48公噸。
中文關鍵字 營建工程、營建工程 逸散污染源、管制策略

基本資訊

專案計畫編號 YLEPB-105-015 經費年度 105 計畫經費 9100 千元
專案開始日期 2016/03/22 專案結束日期 2017/03/21 專案主持人 林宏斌
主辦單位 雲林縣環境保護局 承辦人 邱麗蓉 執行單位 理虹工程顧問股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 雲林縣105年度營建工程污染管制及查核計畫_期末報告_定稿本.pdf 18MB

2016 Project of construction pollution control and inspection

英文摘要 This was which started in March 22, 2016 and ended in March 21, 2017. The primary objects are to give assistance with tighten up construction management business, including inspect and control of building sites, lay pipes and cables, and create governed construction sites information files for the EPB. By the methods, included publicity material, construction pollution conferences, construction site assistance, and educating the knowledge of pollution prevention to achieve the purpose of reduction pollution. To make every effort to raise performance results of air pollution prevention operation of the EPB and improve performance evaluation results from the EPA. The efforts are as follows. The rate of construction emission volume is 61.65 %, and the volume of PM10 is 1,088.33 tons. The declarations of air pollution fee for construction are 3,660 cases and air pollution fees amounted to 39,325,010 N.T. dollars. The project implementation results are as follows. Governed construction sites are 5,183 places and the amount of inspection for building sites are 7,275 times; sites information collected during routine inspection was created files on schedule;3 construction site pollution consultations were held. Constructors (50 sites) were encouraged to join the adopt-a-road program. The street cleaning operation was completed 29,029.02 kilometers, and PM10 volume was reduced 75.48 tons.
英文關鍵字 Construction, Fugitive Particulate Source, Control Strategies