The statistical range of the current period ending report is 106/03/04 to 107/03/03, and the total number of total open applications is 667, and the total declared amount is NT12,854,458.In addition, according to statistics, during the implementation period of the project, there were a total of 1,414 construction sites under construction. The original PM10 emissions generated by the project totaled 402.76 tons, and the project completed a total of 4,182 inspections and managed 1,300 of them. (The management rate of the site was 91.94%.) After the plan was controlled, the management method met the proportion of 72.14%, and the PM10 reduction of pollution suppression was 222.29 tons (the pollution reduction rate was 55.19%).In the field of bare ground investigation and improvement, this year's bare-boned inventory was conducted by planners to carry out periodical surveys of the surrounding areas of the road network from time to time; during the implementation of the plan, a total of 84 pens were managed and the total area of the tubes was 98,625 m2. The total area is 56.864m2. The TSP reduction is 2.01 tons/year, the PM10 reduction is 1 ton/year, and the PM2.5 reduction is 0.4 ton/year.In the open-air burning control, 87 open burnings of the total inspections were found in the open burning situation. Among them, 7 were inspectors and were burned to the scene; in the case of the discovery of open burning, there were 60 to the inspectors. At the scene, the perpetrators were still on the scene. After the inspectors persuaded and stopped, they immediately started extinguishing and strengthened their awareness and harm. The amount of inhibition of TSP was 0.26 tons, and the suppression of PM10 was 0.15 tons.
|