106年臺中市二行程機車汰舊、換購、新購低污染車輛補助作業計畫
中文摘要 | 計畫執行期程自簽約日106 年1 月1 日起至106 年12 月31 日止, 整體工作量完程度已達100%。目前已完成工作項目包含補助案件行 政審查35,992 件、二行程機車汰舊補助申請簡訊發送27,173 則、二 行程汰舊暨低污染電動二輪車補助案件申請說明會3 場、車體廣告 刊登20 輛、宣導摺頁印製4,000 張、宣導海報印製500 張、修訂本 市汰舊二行程機車暨換購低污染電動二輪車補助標準作業流程1 式、建置二行程機車汰舊及新購電動二輪車補助案件線上申請暨審 核系統1 式、二行程機車汰舊及新購電動二輪車補助案件線上申請 暨審核系統維護11 個月、補助案件核銷檢討會4 場次。透過上述相 關執行工作,現階段達成空氣污染物減量成果為NOx:7.3 噸、PM2 . 5: 13.9 噸、NMHC: 183.5 噸, 未來希冀持續推動二行程機車淘汰, 達 到低碳城市之目標。 | ||
---|---|---|---|
中文關鍵字 | 低污染交通工具、二行程機車、汰舊補助 |
基本資訊
專案計畫編號 | 經費年度 | 106 | 計畫經費 | 9200 千元 | |
---|---|---|---|---|---|
專案開始日期 | 2017/01/01 | 專案結束日期 | 2017/12/31 | 專案主持人 | 黃致霖 |
主辦單位 | 臺中市政府環境保護局 | 承辦人 | 陳佩玉 | 執行單位 | 創騏環境科技有限公司 |
成果下載
類型 | 檔名 | 檔案大小 | 說明 |
---|---|---|---|
期末報告 | 05-期末成果報告摘要(詳細版).pdf | 0MB |
Taichung City Allowance Plan for replacement of Two -Stroke Motorcycle and newly purchase of low pollution vehicles in the year 2017.
英文摘要 | The Completion of this project has reached 100% since the contract date from January 1, 2016 to December 31, 2017. The completed items included the following, 35,992 applications of both eliminated two-stroke motorbikes and the purchase of eletric two whe elers. 27,173 text messages of eliminate two-stroke motorbikes application have been sent, 3 orientations of eliminate two-stroke motorbikes and electric two wheelers. 20 public transit advertising, 4,000 brochures, 500 poster, standard operation procedure of eliminating two-stroke motorbikes and merchandising electric two wheelers. Establishment and maintenance ( 11 2 months) the system for eliminating two-stroke motorbikes and new purchasing of electric two wheelers, and also 4 evaluation meetings cross-departments of applications . Through the execution work done above, the air pollution in the stage has been reduce to NOx:7.3 ton、PM2 . 5:13.9 ton 、NMHC : 183.5 ton. We hope to continue to promote eliminating two-stroke motorbikes, to achieve the goal of low-carbon cities. | ||
---|---|---|---|
英文關鍵字 | low-pollution vehicle, two-stroke motorbikes , subsidy |