英文摘要 |
The implementation period of the project this year was from Jan. 01, 2017
to December 31, 2017. The main objectives of this project were to assist the
environmental protection bureau to implement all kinds of regulation and system
management, pollution source audit control and reduction consultation, present
pollution status update and survey and data archiving and regulation
announcement work so as to control effectively the fixed pollution source of
Hsinchu County and to achieve the goal of improvement and keeping of good air
quality in this county. Specific control actions and results of this year were
described as follows:
1 Present status and description of change of listed controlled public and private
sites
In 2017, the number of listed controlled companies was 730, which
was about 31 companies more than the year of 2016. In summary, the total
surveyed release quantity in 2017 was 526 tons for particulate pollutants,
933 tons for sulfur oxides, 2,217 tons for nitrogen oxides and 4,627 tons for
volatile organic pollutants. The difference of the pollutant surveyed release
quantity between 2017 and 2016 was respectively 378 tons more for
volatile organic compound, 442 tons less for nitrogen oxides, 139 tons less
for particulate pollutant and 15 tons for sulfur oxides.
2 All kinds of regulation and system audit and control and quantity reduction
consultation
(1)For permit system management, permit application data will be
reviewed in strict way, permit review principle will be set up, business
waste reporting data will be compared; meanwhile, depending on theactual operation situation, the handling efficiency and operation
condition of air pollution prevention facility will be reviewed; in
addition, one case-time of Gaussian model simulation review has been
finished, 159 companies of responsible personnel have been seized,
and assessment system has been made for the responsible personnel.
(2)The air pollution fee reporting rate and payment arrival rate from fourth
quarter of 2016 to third quarter of 2017 were all 100%. In addition,
five company-times of accounting check and comparison of air
pollution fee reporting data have been implemented, and a total of 4
million and ten thousand NT dollars of air pollution fee have been
collected.
(3)Release coefficient comparison audit and test for sulfur oxide and
nitrogen oxide has been implemented in 2017, and nine companies
were found to have release coefficient comparison results exceeding
their internet reporting results by 20%. Therefore, air pollution
after-payment from these companies has been collected to a total
value of 969 thousand NT dollars.
(4)Three factories have been consulted for implementing air pollution fee
reduction, for example, Standard Dairy Products Taiwan Limited
has switched to use natural gas, and the air pollution fee reporting
amount for sulfur oxide and nitrogen oxide was 13 tons and 6 tons less;
Nankang Rubber Tire Corporation, Ltd. has changed to use natural
gas, and the air pollution fee reporting for sulfur oxide and nitrogen
oxide has been reduced by an amount of 14 tons and 8 tons
respectively; Avatack Co., Ltd. has changed to use natural gas, and its
air pollution fee reporting for sulfur oxide and nitrogen oxide has beenreduced by an amount of 6.25 tons and 4.16 tons respectively.
(5)Instruct the Chupei plant of ChipMos Technologies Inc. to make air
pollution fee reduction application for improvement and prevention
equipment; meanwhile, experts and scholars review meeting was held
to approve the amount of reduction.
(6)Use FID instrument to conduct the sorting of target for prevention
equipment efficiency audit and test, this year, through FID test, 11
root-times have been found for the handling efficiency of the
prevention equipment to be lower than the permitted and approved
efficiency, and all the factories have been asked to improve.
(7)Instruct the hotel industry, all levels of schools and hospitals to phase
out old fuel-firing boiler, this year, 13 public and private sites had the
willing to change, and the improvement status was continuously
followed up, 1 company has finished the replacement.
(8)Strengthen the audit on the catering industry, and instruct 28 companies
with petition from the public to install oil and smoke prevention
equipment; meanwhile, the installation of oil and smoke prevention
equipment for catering suppliers in Kuang-Ming Circle of Chupei has
been finished, the instructed installation rate has reached 100%;
meanwhile, 3 session-times of oil and smoke prevention
announcement and explanation meeting for catering industry had been
made; meanwhile, instruction and audit for catering companies of
Chupei night market, Neiwan old street, Peipu old street had been
implemented.
(9)Promote the use of natural gas by the industrial boiler, and four plants
had been helped to share the fee of natural gas pipeline and thereplacement of fuel-firing boiler.
(10)Promote the talk of the nitrogen oxide reduction for coal-firing boiler,
and the pollution improvement talk with Hsinchu plant of Tong Hwa
Synthetic Fiber Co., Ltd. had been finished, and improvement was
expected to be finished by 2020.
(11)Promote the odor improvement talk with the glass industry, and
instruction had been provided to Ta Hsiang Containers Industrial Co.,
Ltd. to install prevention equipment to improve process odor
collection and handling; meanwhile, the improvement for Chutung
plant of Jiu Zhan Glass Enterprise Corporation had been followed up.
In this project, in addition to finishing all kinds of jobs specified in the
contract, pollution amount reduction had been requested and related odor
pollution improvement instruction had been provided to the companies so as to
enhance air quality and to improve satisfaction form the public of this county.
|