英文摘要 |
Taoyuan City, the number of fixed sources of pollution 2,586, which are based on the Environmental Protection Department's "Fixed Air Pollution Source Management Information System". Fixed pollution sources Pollutant emissions statistics included particulate contaminants 3,100 ton/year, sulfur oxides 5,117 ton/year, mitrogen oxides 14,627 ton/year, volatile organic compounds (VOCs) 23,755 ton/year .
The execution of the project was scheduled from 2017/03/24 to 2018/03/23 with a total of 12 months. The progress in implementation of each individual work, included the control of VOCs, pollution reduction, inspection of factories, pollution control of Taoyuan refinery of CPC corporation, supervision of periodic detection & online reporting review, renewal or maintenance of CEMS for compliance with CEMS regulatory, and handling regulatory seminars etc., were executed according to the schedule of the project. All the progress of the work complied with the contract requirements, the abstract of achievements .
The key works of the project in this year are including:
(一).The control of volatile organic compounds(VOCs):
1.There are 237 special manufacturers, the overall reporting and review rate of 100%.
2.Since 100 years with the Environmental Protection Agency industry special project control, In the year of 106, check the 32 gravure printing industry in Taoyuan City. As of 2018/3/23, 20 manufacturers have planned to improve the source raw materials or control equipment. Including: 17 plants planned to set up combustion-type control equipment, 3 plants to improve the original source materials, 6 reached to improve control equipment, VOCs to reduce 2,986 tons / year.
3.Completion of 283 station gas station inventory and regulatory compliance check operations, after inventory of VOCs emissions of 714.16 tons. Another completion of 62 stations A/L ratio test, 158 failed to improve the completion of the reduction of 54.35 tons / year, the overall A/L ratio of 83%.
4.In the fourth quarter of 2017, 516,982 device components were declared,
The implementation of Nectarine refineries and other petrochemical industry a total of 3,074 equipment components inspection and testing,
17 Leakage Concentrations Greater Than Leakage Control (>1,000 ppm), Complete Repairs Within Duration, Retest Concentration Less than 250 ppm After Improvement
5.Pollution control of Taoyuan refinery of CPC corporation : 8 hydrocarbon (HC) ground flare started from 105/01/01 FGRS system recovery process exhaust gas to fuel gas system and three hydrogen sulfide combustion towers completed in 103/5 full improvement to sulfur plant recycling, 106 years of use for 1 days,compared to 104 days of use 325 days (FGRS system is not start up before), the use of emissions days decreased by 99%;Statistics. Popular petitions, there are total of 27 air pollution petitions in 2017.
(二).CEMS regulatory: 37 pipelines of 18 factories in Taoyuan City are subject to CEMS, of which 28 pipelines of 11 factories have been connected . Conducted CEMS functional check of 28 pipelines in 11 factories, with 100% pass rate after coaching improvement. In addition, the 23 RATA inspection are also completed, and comparison of the data between manufacturers' RATA and during the investigation period, the mean value within 72 hr is not greater or smaller than the 3 times standard deviation, the all data quality are good.
(三).Inspection of stationary pollution sources:Discharge pipeline inspection to complete the completion of 33 samples, the failure rate of 16%. People complained inspection and testing completed 10 samples, the failure rate of 10%.
(四).Fixed source and control equipment monitoring and management operations: 105/6/16 issued "Taoyuan City, fixed pollution and control equipment, monitoring and management of self-regulation regulations", 106/11/30 the completion of the connection. Assist the EPB in providing examples of Set up Plan to counsel the industry. A total of 46 factories 53 manufacturing processes (excluding sand and gravel manufacturing industries) have an effective monthly transmission rate of over 94% and a license compliance rate of over 91%.
The relevant contents in details will be presented in the upcoming sections.
This project extended the investigation in 2016, and remain committed to synchronously combined with advanced instruments for inspection and counseling task. To strengthen the abilities of inspection, based on charging overdue air pollution fee as the incentive for counseling. It can feedback the real pollution situation and implement the licensing system to reach the goal of the 2017 Taoyuan city pollution control project in NMHC reduction. Decrease in NMHC 2,986 tons / year, achievet 106 years Taoyuan City pollution control measure, NMHC decrease 2,000 target.
|