英文摘要 |
The work schedule of this project has been from April 15, 2006 to February 14, 2007.
The implementation results at this stage are as follows:
I. Analysis of the consolidation of the inventory of public and private places
There are 49 listed factories in Pingnan Industrial Park (currently 6 have been shut down) and 33 unlisted factories (3 companies are currently shutting down); 21 factories in Pingtung Industrial Area and 116 factories are not listed (currently set up factories) 15 of them were closed and 8 of them were closed; 19 of Neimu Industrial District's factories are in operation (one is currently shut down) and 38 are unlicensed factories (4 are currently suspended); Pingtung Processing and Exporting Zone is jointly owned by the listed There are 9 factories out of which 25 are not listed; Pingtung Agricultural Science and Technology Park has 25 factories and 22 factories are not listed.
II. Risk Assessment Work in Industrial Zones
The Pingnan Industrial Park uses 87 factories with high-risk species totaling 8 plants and 18 processes, including 12 high-risk species; Pingtung Industrial Park uses 87 plants with high-risk species totaling 2 plants and 2 processes , using 2 high-risk species; Pingtung Processed Export Area uses 87 high-risk species for a total of 1 plant, 1 process, uses 1 high-risk species; agricultural science park uses 87 high-risk species for plant 1 Inter-plant, 1 process, using high-risk species 1, the Neipu Industrial Zone now has no factories and processes using high-risk species.
After calculating the risk potential of each industrial area within the jurisdiction according to the calculation method of process risk indicators, it was learned that Pingnan Industrial Area within the jurisdiction of Pingtung County is a high degree of risk, Pingtung Industrial Area, Neipu Industrial Area, Agricultural Science and Technology Park and Pingtung processing export zone is of low risk degree.
Third, the perimeter of harmful pollutants detection
The project uses Canister to complete sampling and analysis of hazardous air pollutants at the perimeter of the industrial zone for five times. The sampling sites are Changxing Materials, Honglai Industrial, Shenfeng Special Materials, Xujing Environmental Protection Technology and Honglai Industrial Co., Ltd. Department.
Fourth, open path infrared spectrometer (OP-FTIR)
The program has completed 30 days of OP-FTIR monitoring and inspection work this year. The monitoring target selected Changxing Material Co., Ltd. in Pingnan Industrial Area, Shenfeng Special Application Material and Honglai Industrial Co., Ltd., and 1,3-butadiene and propylene during the monitoring period. Nitrile exceeds its perimeter standards.
V. Odor Contamination Control Operations
1. The project's implementation of gas station audit inspections has detected a total of 66 stations in the A/L ratio test and 66 stations in the air leak detection.
2. This year, FLIR assisted in the implementation of a total of 10 process components and a total of 5,500 components in the testing of equipment components. Among them, Shenfeng Special Application Co., Ltd. Pingtung Plant has a leakage value of more than 10,000 ppm and has been opened by the EPA. Single report.
Sixth, hydrogen sulfide air quality continuous monitoring station and odor odor incident strain system maintenance
1. The maximum H2S concentration was 19.84 ppb from March 1 to December 31, 106 (instrument calibration work monitoring data was eliminated), and the daily average concentration was 1.86 ppb from March to December of 106. The main wind direction was from the west. In the western and southwestern regions, the wind speed is about 0~3m/s.
2. Odorous odor event response system completes routine site maintenance at least once a month from March to December
7. Self-management of road dust in Pingtung Industrial Zone and Neipu Industrial Zone
At the end of this year, Pingtung Industrial Park and Neipu Industrial Road had a total length of 13.5 km. The adoption number of roads cleared by the adoption companies was 1644.7 kilometers, and the estimated reduction of PM10 was about 4.26 metric tons. And PM2.5 is about 0.98 metric tons.
8. Pingtung County Air Pollution Fingerprint Database System
This year, the team has completed the installation of hardware and software for the air pollution fingerprint database system and completed system testing.
Nine, emergency response drills
This year, on December 13th, Changxing Materials Industry (Changsha) Co., Ltd. was used as the venue for the drills. One emergency drill was conducted. The drill was carried out by the magnitude 6 earthquake in Yuxiang Township, resulting in Changxing Material Materials Industry Co., Ltd. The looseness of the flange element of the formaldehyde tank of the South Plant resulted in the leakage of formaldehyde material in the pipeline and caused the fire and personnel were sent to the hospital. After receiving the notification, the EPA immediately reported that the county government had initiated an emergency response mechanism.
|