英文摘要 |
The number of controlled pollution fees within the jurisdiction is 1,392, of which 103 factories and 275 gas stations are in compliance with the special laws. The project team reviewed and checked the compliance of laws and regulations for the implementation of laws and regulations this year. At present, it has found 4 factories with flaws, and has requested the factory to improve and follow-up. In the year of 2017, according to the special law for industry within the jurisdiction, we aimed to track the improvement of items with flaws in 2016. And in the year of 2017, the items with flaws were reviewed and improvements were fully made. The improvement rate was 100% (Chi Mei Industrial implemented improvement on schedule), and they regularly updated and checked the emissions of sources of pollutant emission in compliance with the special laws of the jurisdiction. After the inventory review, the inventory was updated. The emissions of VOCs from law-controlled factories are 719 metric tons. Six factories have completed the reduction coaching to improve their equipment and improve pollutant treatment efficiency. As for the equipment components, one factory was found to be inconsistent with the standard and it had been punished.
In compliance with the automatic continuous monitoring facility connection control, factories had done the check of the function and compliance of the regulations, reaching a level of 100%, and the NO2 conversion rate of one factory was less than 90% as the draft specification, and guidance was provided for improvement. This year's factory regulations and function check summary: Although the functional inspection of the two factories in the jurisdiction had been better than that in previous years, in the CGA check, the HCl check rating was low (Grade C). Extra attention had been asked to pay to the stability of the equipment and strengthening the maintenance. There are no flaws in the two power plants (Senda and Taiwan Cogeneration Corporation), but the latter's RATA audit results must be adjusted with BAF amendments. Only Rongcheng and Huaxin Lihua, which were only monitored with the OP, did not meet the full range of 20% to 80% of the regulations, and often fell below 20% of the full scale. Guidance had been provided and they had to apply for a single full-scale application. In addition, the two connected factories with transmission of data over the limit, had been reported punishment.
Implementation of the 20 stations gas-oil ratio and air leakage testing were all in compliance with regulations, and all substandard oil guns were improved, resulting in reduction of pollutants by 5.564 metric tons.
In recent years, the project team has recovered more than NT$66.05 million in pollution charges. In the year of 2017, through inspections and on-site inspections, more than NT$5.71 million has been recovered. In addition, through the amendment of the single-plant measurement method, the annual revenue of subsequent air pollution fees increased by NT$18.49 million; the accuracy rate of the declaration of pollution fees by operators in the area increased by 79% from 2012 to 89%, and it continued to reach 100% including the declaration rate of pollution fees, online reporting rate.
In recent years, restaurants cooking fumes have been paid more attention to. In addition to repeated inspections, this year, we have helped 75 restaurants to install preventive and control equipment. However, for those who have equipment but still being questioned by the public, on-site counseling had been included for immediate improvement. In total, they contributed to the reduction of pollutants by 13.84 metric tons. Including 7.3 metric tons of particulate pollutants (7.010 metric tons of PM10 and 6.57 metric tons of PM2.5), 6.54 metric tons of NMHC, with 85% improvement rate in the improvement of pollution statistically, and even an improvement rate of 100% in expert counseling, showing that the regulation is working well. In 2017, new department stores and large-scale food and beverage restaurant had been added into administrations for control, and new establishments of food and beverages were jointly regulated with the EDB and the Health Bureau. Through multiple controls, air quality was improved.
During the project period, with attendance of emergency pollution incidents (including holidays and nights), press release writing, data submission, project inspection, and conference holding, a total of 68.72 metric tons of contaminant activity was reduced during this year.
|