英文摘要 |
First, the name of the Chinese plan: 107 years of Taidong County diesel vehicle exhaust smoke detection and oil testing program
Second, the plan number: 106400130644
Third, the implementation unit: New Research Green Energy Technology Co., Ltd.
Project Host (Co-host): Lin Zhangwen (Chen Yongxun, Zeng Qihua)
V. Implementation start time: January 1, 107
6. Execution end time: December 31, 107
7. Report completion time: December 20, 107
Eight, the total number of pages: 391 pages
Nine, report electronic file name 106400130644
X. Report electronic file format: PDF
XI. Chinese abstract keywords: diesel vehicle exhaust smoke detection, oil product testing
Twelve, English abstract keywords: Diesel smoke detection, detection of oil
XIII. Chinese abstract:
In order to solve the pollution caused by mobile pollution sources, it is imperative to audit and ban the operation. This year, the county environmental protection bureau continued to implement self-management and air quality maintenance area control operations to improve the air quality of the county. A summary of the results of the various control work of the plan is as follows:
The implementation period of this year's "Diesel Vehicle Exhaust Smoke Detection and Oil Testing Program" will run from January 1, 2007 to December 31, 2007. As of December 20, 2007, the relevant control operations include inspection and inspection operations, laboratory quality assurance and quality control operations, empty product maintenance area control operations, insurance inspection and integration promotion operations and publicity operations.
The important matters implemented during the year and their results are described as follows:
I. Laboratory quality assurance product management
(1) Completed the national chassis power meter in March
(II) Complete laboratory certification maintenance and evaluation operations in March and obtain extension certification.
(3) Complete the quality assurance operations of the laboratory, including instrument calibration, standard vehicle testing, personnel capability comparison, laboratory comparison, smoke meter comparison, full-width corrector torque correction, laboratory internal inspection and management review, etc. operation.
Second, inspection and testing operations
The number of smoke detectors in the power meter reached 1,214, and the total number of unqualified cases was 32. The total failure rate was 2.6%. The horsepower ratio was less than 11 times, and the rejection rate was 0.89%.
Third, visual inspection of tobacco operations
There were 516 notices of visual judgment, and a total of 476 inspections were completed (471 inspections were qualified, 5 inspections were unqualified), 22 were stopped or cancelled or scrapped, and 18 notifications were issued.
Fourth, roadside inspection operations
1122 vehicles were inspected on the roadside. After screening, there were high pollution and the number of vehicles detected was 845 vehicles, and 86 vehicles were unqualified. The failure rate was 10.2%.
V. Joint inspections totaled 446 vehicles, of which 113 were pumped (25 were sent for inspection, and the inspection results were all qualified), and 333 vehicles were intercepted (241 inspections, 31 defectives, and 9.3% failure rate) .
Sixth, the station and outlying island inspection services reached 190 vehicles, all of which were qualified.
Seven, old vehicles notify the inspection
Sending old vehicles to notify 647 inspections, 264 inspections, the return rate was 40.8%, 17 failed, and the failure rate was 6.4%.
Eight, failed to improve the homework
From the beginning of January 1, 2006, as of October 31, 2007, a total of 115 failed tests, and the number of improvements was 111, of which 105 were re-inspected, and the test failed. The score of 0 is not qualified. After verification, it has been verified that the supervisory unit has handled 6 scraps, cancellations, cancellations, suspensions, thefts or recycling; 4 of the improvement period, the overall unqualified improvement rate is 97.0%.
Nine, diesel vehicle management situation
According to the EPA's non-scheduled inspection information management system for diesel vehicles, the diesel vehicle system management rate was 99.03% from January to November 2007.
X. Oil product inspection operation
The inspection of 30 pieces of oil is in line with the standard.
XI. Independent management of diesel vehicles
There are 101 self-managed households, the total number of vehicles is 744, the total number of inspection vehicles is 547, the self-management inspection rate is 73.5%; the number of self-management management seals is 541, of which 282 are issued national standards. There are 259 stamps in the county, and the signature rate is 72.7%.
Twelve, the inspection and integration work
The maintenance factory promoted the inspection and certification certification operation, and interviewed 10 maintenance factories, of which only one was willing to cooperate with certification and continued counseling. The county's certified maintenance factory (Xiangsheng Enterprise) conducts correlation comparisons every month, and the comparison results are in line with the error range; each quarter check meets the requirements; the annual invitation of Lu Forest Commission to supervise the evaluation is also affirmed.
XIII. Control of empty product maintenance area
(1) Inspection and control operations in the air quality maintenance area, 556 inspections of air quality maintenance areas, 40 inspections, and 516 roadside inspections (including 313 inspections). According to the period analysis, there are 281 vehicles in the 1~3 period (accounting for 51.0%), and 275 vehicles in the 4~5 period (accounting for 49.0%); the total number of inspected articles is 374, and there are self-management standards. Chapter 134 and issued 240 air quality maintenance area stamps.
(2) Planning of the Green Island Air Quality Maintenance Area, the progress has been completed and the briefing session and the briefing session will be completed. After the approval of the autonomous regulations (draft), the announcement stage will be completed.
XIV, publicity work
Promote homework and conduct six promotion activities, including one-time "old-age vehicle outsourcing activities", "inspection and self-management policy activities briefing session" and "self-management policy activities briefing session" The number of presentations was 1,750 copies of propaganda and 1000 copies of propaganda, and 12 press releases were issued. The questionnaire statistics were 321 (211 in the station and 110 in the road).
Fifteen, reduction
The total number of reductions was 1,797, and the pollutants TSP and PM10 were reduced by 36.839 metric tons per year and PM2.5 by 20.261 metric tons per year. .
XVI, EPA evaluation
The action plan assessment currently reaches 98.5% of progress:
(1) Obtained a stamp rate of 79.4%
(2) The proportion of tour buses in the fourth to fifth phases is 99.1%.
(3) The self-management of the team was 73.5%.
(4) The rate of issuing certificates was 72.7%.
(5) The A-1~A-2 mark rate was 79.4%.
17. Highlights of the project:
(1) The power meter detection rejection rate was 0.9%, which was the lowest in the calendar year.
(2) The inspection rate of the official fleet was 82.4%, which was 30% higher than last year.
(3) The inspection quality of the air quality maintenance area will be further improved.
Since the implementation of this project, various diesel vehicle control related businesses have been implemented. The main tasks of the project are to check the smoke station inspection, roadside inspection and inspection, diesel vehicle oil product inspection and various administrative related work to improve the air quality of the county. The Environmental Protection Agency strengthened inspection control and handling of propaganda to improve the county's diesel vehicle management rate, thereby improving the county's air quality.
|