During the implementation period of this project, from july 19, 2018 to
december 31, 2018, the implementation period is 5.5 months. At present,
the total number of people to be executed is 3, and the planning direction of
the project is as follows: 1. Construction engineering machines installation
The filter is used to review the operation. 2. Construction engineering
machines and equipment are equipped with smoke detectors. 3.
Construction engineering machines operation survey operation. 4.
Construction engineering machines opacity detection operation. 5.
Construction engineering machines installed with smoke filter propaganda
briefing session
At this stage, due to the fact that the construction engineering machines
control policy has not yet been clarified, some operators have indicated that
they will decide whether or not to cooperate with the installation of filter
filters after the regulations have been revised.
Construction engineering machines survey and statistics during the
period from july 19, 2018 to december 31, 2018, the screening project was
conducted at the timing of land preparation, foundation excavation,
earthwork backfilling, etc., and more than 449 construction engineering
machines were investigated. In terms of administrative districts, banqiao
district (51 vehicles), bali district (50 vehicles), xindian district (48
vehicles) and sanchong district (48 vehicles) are the most, wuyi district (37
vehicles) and tucheng district (37 vehicles) are ranked second. The
distribution of administrative districts can bring high density. Use the area
of the construction implement.
The project has carried out a total of 220 construction sites for the
construction of construction engineering machines and installation of filter
filters, and the project owner and contractor accounted for 407 (details
3.2-1), and announced that the administrative area will be announced at 34
sites in Sanchong District. The largest number of guides was 47, and 30
sites in the Banqiao District were declared to be 51. The overview of the
itinerary section can bring out areas of high-density construction
engineering machines. The engineering category is RC building
engineering (184), SRC building engineering (71), and third (51).
The project carried out 66 surveys on the construction work status of
construction engineering machines. The survey equipment included 35
excavators, 14 generators, 11 wheel/crawler cranes, 4 bulldozers and 2
stackers, some of the implements were found to be not operating normally
after the completion of the survey equipment, and the exhaust pressure was
not significantly changed.
The construction engineering machines has 169 pieces of opacity
measurement, with the largest number of excavators 84, followed by 31
generators and 30 wheel/crawler cranes. This is the opacity of construction
equipment. measurement record. There are 10 pieces of opacity
measurement results exceeding 0.6m-1. In addition to the incentives,
operators can adjust the injectors and nozzle pumps regularly to reduce
black smoke and PM2.5 emissions.
In order to promote the action measures for the construction of the filter
machine in the construction equipment of the New Taipei City Air
Pollution Control Action Plan, on August 29, 2018, the “Construction and
簡摘-6
Construction Equipment Installation Smoke Filter Promotion Guide” was
held for the new The application method for the construction of the filter
machine for the construction engineering machines in the construction of
the New Taipei City will be explained. The participants can understand the
original intention of the regulations by means of negotiation and put into
practical action to solve the pollution problem of the Construction
Engineering Machines. In addition, in order to effectively assist the
Environmental Protection Agency to promote the construction of filter
machines for construction Engineering Machines, on September 3, 2018,
the " New Taipei City Construction Engineering Machines Construction
Equipment Adding Filters Expert Consultation Meeting" and "September 4,
2018" A briefing session for the installation of filter filters for construction
engineering machines in the construction of the New Taipei City."
RSEA Engineering Corporation. took the lead in the December
28,2018 to put forward the construction engineering machines to install
diesel particulate filter subsidy application, and January 28, 2019 to
complete the installation operation, through the plan for construction
equipment before and after installation of non-transmittance detection,
pre-installation non-transmittance is 0.64m-1, after installation for
0.05m-1 , the removal rate of black smoke is up to 92.2%, and the
construction equipment can effectively reduce the emission of black
smoke after adding diesel particulate filter. It is suggested that in order to
strengthen the control efficiency of old construction tools, in addition to
strengthening the concept of maintenance and maintenance, another car
age between about 11-18 years of construction equipment plus diesel
particulate filter can significantly reduce black smoke emissions, in order