環境資源報告成果查詢系統

結合風險分析平台推動污染場址管理計畫

中文摘要 為持續強化風險圖像工具與推動污染場址管理,本計畫針對風險圖像線上分析資訊系統進行優化,增加環域分析及疊圖分析工具、以及兩項決策主題模組,分別為整治效益及成效評估模組、土地開發再使用模組,提供場址管理決策參考。本計畫運用風險圖像分析成果與評估決策指標,協助評估及篩選3處可優先運用風險管理之停滯場址作為示範案例,考慮土地利用現況、污染情形、環境特性及受體類型等影響因子,執行風險評估及風險圖像產製,並依分析結果規劃適合之風險管理方式,作為主管機關場址管理推動之參考,另可提供地方環保機關後續執行之輔導。此外,考量污染場址與利害關係人溝通之需求,本計畫提出風險溝通推廣及輔導規劃,及建立風險評估作業公私協力治理機制,同時強化風險分析之宣導與辦理相關訓練課程。在法規與相關行政作業方面,本計畫協助土壤及地下水健康風險評估平台運作,並檢討相關制度及法規,精進污染場址改善計畫審查效率。
中文關鍵字 風險圖像、污染場址管理、風險管理

基本資訊

專案計畫編號 EPA-107-GA11-03-A161 經費年度 107 計畫經費 16900 千元
專案開始日期 2018/06/19 專案結束日期 2020/06/18 專案主持人 梁栢瑋
主辦單位 土污基管會 承辦人 張芯瑜 執行單位 環興科技股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 EPA107GA1103A161_期末報告.pdf 33MB EPA107GA1103A161期末報告

Promotion of Contaminated Site Management with the Integration of Risk Analysis Platform

英文摘要 To continue strengthening risk map tool and promoting contaminated site management, this project was aimed to upgrade the capabilities of current “Risk Map Analyzing and Information Displaying Platform” by adding new features, such as buffer analysis, map overlay analysis, 2 new decision support modules (Remediation Performance Evaluation Module and Contaminated Site Redevelopment Module). Additionally, this project had developed several decision making indicators by utilizing the risk map analysis results and these indicators were used to select 3 stagnant demonstration sites that were suitable for conducting risk analysis and implementing risk management measures. All these implementation results and modalities can be used as future references for the local environmental competent authorities when in need to carry out the above mentioned related work. In view of the need for communication with the stakeholders, this project had proposed the expanding and counselling plan for risk communication, established public-private collaboration governance mechanism for risk assessment and enhanced the propaganda and training courses for risk analysis. Finally, this project had assisted the running of the Soil and Groundwater Health Risk Assessment Platform, which during the term, laws and regulations were being carefully discussed in order to shorten the time needed for reviewing the report.
英文關鍵字 Risk Map, Contaminated Site Management, Risk Management