This project is being carried out since 1st Jan 2019 under a signed contract, looking into the final report based on quantitative work result, which dated till 31th Dec 2019, every monthly completed tasks and accumulated progress fulfilled the objectives requested by the contract. Results of the project are being summarized as below.
About the promotion of stationary sources permit system , within 256 cases of permit examination, 125cases of permit application were being examined fully; 133 cases were being examined substantially, 43 premises stated in the officially announced lists(The 1st and 2nd batch) required to report emissions quantities were made inventory. 1633 fixes were made accordingly to EPA check results of monthly correction database abnormal columns. About the examination, issuance and checking of permit, new technicians were hired to assist with examinations this year, while 6 cases were being appointed to them. 120 manufacturing process checking were done, 11 cases were found non-complying to issuance, 8 follow-up tracking improvement were completed, checking compliance rate is 97.5%.
The continuous promotion of air pollution reduction tasks, for all of the operation permits issued this year, there are 12 manufacturing process complete pollutants reduction tasks, the reduction way includes: reducing the raw material used, reducing the fuel used…, particle pollutants decreased 124.4 tons were reduced, sulfur oxides decreased 27.5 tons were reduced, nitrogen oxides decreased 663.6 tons were reduced, this project will continuously promote the reduction control operation to improve air quality.
1,152 data on inspection record were built this year, 937 cases of implementing regulation compliance, 216 cases of inspections. 13 times of Ambient /Flue physiological functional test of odor were carried out; 26 random sampling tests on sulfur content of oil and coal comply the regulatory standards. 5 times detection of flue dioxin and 4 times detection of heavy metal were carried out respectively. Based on the inspection and detection results, 11 cases were given penalty this year, with fine amount sum up to 1.6 million dollars, while 11 cases were being ameliorate, giving an improvement rate of 100%.
In total of 918 cases of air pollution control fees(includes VOCs) on-site inspection were done dated up until 31th Dec 2019, 453 air pollution control fees examinations were completed, total emission amount of SOx is 2,926 tons, NOx is 9,147 tons, giving accounting amount of 99,424,371 dollars, VOCs accounting amount of 2,459,574 dollars, Par.、dioxin and heavy metal accounting amount of 72,277,641 dollars, accumulating to air pollution control fees total amount of 174,161,586 dollars. Every seasonal online declaration rates are 100%.
Dated up until 31th Dec of 2019, industrial regulatory compliance inspections were done on 231 companies that were registered in the industry list , giving an inspection rate of 100%; 7 times of updates were made on EPA emergency contacts and equipment information system. Deep inspective operations were carried out on 2 factories respectively, one being done in TCC during 24th June till 5th July of 2019, while another were completed in CHPC Hualien during 30th July till 10th August of 2019, the operations consisted of on-site inspection, committee on-site assessment, document inspection, night inspection, unknown gaseous sampling analysis(GC/MS)and other major tasks etc.
|