環境資源報告成果查詢系統

108年度營建工程污染管制及查核作業計畫

中文摘要 1.本計畫主要工作重點為協助環保局加強辦理各項營建工地,管線、道路施工之稽、巡查管制工作,並將列管工地資料建檔管理,透過宣導資料發放及法令宣導說明會之進行,加強工地對污染防範之認知,以落實污染改善之目的。 2.為提升環保局空氣污染防制工作執行績效,爭取環保署考核佳績,108年度營建工程削減率56.69 %,巡查納管率 75 %。 3.營建工程空氣污染防制費總申報件數計有4,376件,總申報金額為73,628,835元。總計納管7,306處工地,累計巡查數達8,793處次,經由例行性巡查並將工地資料完成建檔外,且辦理6場次營建工地法令宣導說明會議,輔導82處營建工地執行道路認養,洗掃總長度達52,968.2公里,PM10削減達137.72公噸。
中文關鍵字 營建工程、逸散污染源、管制策略

基本資訊

專案計畫編號 YLEPB-108-004 經費年度 108 計畫經費 13700 千元
專案開始日期 2019/01/04 專案結束日期 2019/12/31 專案主持人 林宏斌
主辦單位 雲林縣環境保護局 承辦人 邱麗蓉 執行單位 理虹工程顧問股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 01-本文_雲林縣108年度營建工程污染管制及查核作業計畫_期末報告(定稿本).pdf 19MB

The Project of construction pollution control and inspection for Yunlin County in 2019.

英文摘要 1.The primary objects are to give assistance with tighten up construction management business, including inspect and control of building sites, lay pipes and cables, and create governed construction sites information files for the EPB. By the methods, included publicity material, construction pollution conferences, construction site assistance, and educating the knowledge of pollution prevention to achieve the purpose of reduction pollution. 2.To make every effort to raise performance results of air pollution prevention operation of the EPB and improve performance evaluation results from the EPA. The efforts are as follows. The rate of construction emission volume is 56.69 %. The rate of the emission inspection and governed inspection are 75 %. 3.The declarations of air pollution fee for construction are 4,376 cases and air pollution fees amounted to 73,628,835 N.T. dollars; the number of air pollution fees declarations of this year is highest in three years. Governed construction sites are 7,306 places and the amount of inspection for building sites are 8,793 times; sites information collected during routine inspection was created files on schedule;6 construction site pollution consultations were held. Constructors (82 sites) were encouraged to join the adopt-a-road program. The street cleaning operation was completed 52,968.2 kilometers, and PM10 volume was reduced 137.72 tons.
英文關鍵字 Construction, ConstructionFugitive Particulate Source, Control Strategies