There were 578 applications declared, and air pollution charges of TWD 10,412,290 were reported. In the settlement of completion, the refund amount was TWD 1,239,579, and the additional payment was TWD 4,713,766. There were 70 overdue cases and TWD 19,311. The total net income of the related cases after combined calculation was 13,905,788 yuan.
There are a total of 1,165 construction sites under construction, and the original PM10 emissions generated by them total 590.48 tons. The plan has completed a total of 3,997 inspections, of which 1,122 are managed (the site management rate is 96.31%). After the control of the plan, the compliance ratio of the management measures was 74.34%, and the PM10 reduction by pollution control was 337.44 tons (the pollution reduction rate was 57.15%).
In terms of bare land control, 130 bare grounds were located in the bare grounds inspected by the planners, with a total area of 116,578 m2. 49 improvements have been made, and the improvement area is 61,660m2.
In the field of open-burning control, a total of 108 open-burnings were inspected. If open-burning was found, we immediately asked for extinguishment and strengthened the publicity of the not-open-burning concept and harm. After conversion, the suppression amount of TSP was 590 kg and The suppression amount is 578 kg. It also handled 4 open-air burning briefing sessions, and 33 publicity red cloth strips were hung on the main traffic roads or in obvious locations in the village to improve visibility and effectiveness.
|