英文摘要 |
The content of writing the mid-term report of the pollution control plan for construction projects in Hsinchu City in 108. The main statistical period of the work results is up to December 31, 108. The commissioning unit Kangting Engineering Consultants Enterprise Co., Ltd. will assist in the implementation of The construction project inspection and inspection control, management method check and guidance, construction air pollution charges collection and publicity operations, etc., all work items are executed according to the planned progress. Detailed work execution methods and results are described in each chapter.
Based on the concept of improving the quality of service for the people, e-declaration services have been continuously promoted in the construction of air pollution charges. During the period, a total of 357 construction projects used electronic means to handle air pollution declarations, including 230 start-up declarations and 127 completions. For settlement, the average is about 40 times per month, accounting for 21% of the total number of declarations and settlements, of which the start-up e-accounting accounts for 26% of the total start-up declarations, and the completion e-declaration accounts for 15% of the completion reports. In terms of air pollution fee payment, we also continued to promote small-scale air pollution fee e-payment service. A total of 1,194 bar code payment forms were opened, which increased the payment efficiency by 66%. In addition, in terms of strengthening the air pollution fund, 901 cases were reported during the plan period, and a total of 21,369,259 yuan in construction air pollution fees were levied. At the completion of the unsettled inventory operations, a total of 977 air pollution charges were required due to changes in the scale of the project or an increase in the construction period. A total of 5,667,635 yuan was repaid, and 18 repair projects and 5 overdue cases were seized and air pollution charges were recovered. RMB 273,104. At the same time, in conjunction with the telephone notification and the way of issuing documents, the construction air pollution fee reporting rate has been improved to make the construction air pollution fee collection work more convenient and convenient for the people.
The control side is mainly based on the regulations for the management of air pollution prevention facilities in construction projects, with action plans such as hierarchical inspections, color list control, advisory list notifications, and site counseling, in addition to promoting construction sites to actively do pollution prevention and road adoption. , And also invested manpower to gradually check the construction sites under its jurisdiction. At the end of the period, a total of 4,980 site inspections were completed. The inspection rate of the first-level site was 98.1%, and it was based on the site size, construction period, lack of violations, and whether it was a major public project. Among other conditions, 21 key projects were selected for key counselling. During the counseling period, the average pollution reduction rate was increased from 49.5% to 68.5%, which was better than the city's average reduction rate of 54% and the average improvement rate of missing improvements was 91%. It also promoted key regional controls specifically for the three areas of Guanpu, Old City, and Jinya. Except for improvement, the average reduction rate was 67.3%, an increase of 7.1%; and there were also significant improvements in the number of missing points. The number of points was as high as 9.9 points, which decreased to 3.4 points after the control, which has decreased by 6.6 points compared to the pre-control level. The improvement rate of missing points was 66%, and the number of cases reported to the Guanpu area was 74, compared with 83 in the same period last year. The number of cases adopted in Jinya ’s heavily demarcated areas has been increased to 2.1 kilometers, an increase of 600 meters compared to last year, and the road network has extended 300 meters in series. The color difference of the entrance and exit of key areas in the old city has been improved by 50%. During the period, a total of 6 projects cooperated with the landscaping of the fence, and its length was set at 275 meters. In terms of promoting road adoption and cleaning at construction sites, a total of 130 places were counseled to participate in road cleaning operations, with an adoption mileage of approximately 26.8 kilometers and a total cleaning length of 13,694 kilometers. It is estimated that a total reduction of 188.98 metric tons of TSP will be reduced. In addition, through the street dust load detection operation, it is confirmed that the project performs road cleaning operations. During the planning period, the amount of soil dust before and after the street is compared, and the reduction range is 0.1334g / m2 to 9.03g / m2. The average reduction rate of pollution reduction operations was 54%, which was an increase of 51.6% from the same period last year. This year, unmanned aerial vehicles were continuously used to perform area aerial shooting operations for a total of 4 times (3 projects, 1 specific area), and cooperated with on-site inspection to check for missing and improving operations. Liming Development Co., Ltd. ’s new construction of shops, housing complexes, and parking spaces. The reduction rate of pollution reduction before and after comparison was increased from 62.7% to 66.6%; the reduction rate of the new project of Hongzong Holy Church College was increased from 65.1% to 69.2%; and the demolition project of Sinopec Hsinchu Oil Depot was maintained. At 68%. In the implementation of the propaganda work, it strengthened the propaganda through regulatory briefings, site workshops, and electronic media, and used a variety of propaganda methods to improve the effectiveness of the propaganda and familiarize manufacturers with the requirements of the law.
|