英文摘要 |
This project has been executed since Jan.,
2020 , including motor
vehicle noise control, traffic noise pollution inspection o on public sentiment
(for railroad and nonnon-ionizing ra diation (base station and electric
facilities), environmental noise check, airport noise control center &
monitoring station check, and instrument verification and calibration, etc.
The plan was implemented from Jan. 1st, to Dec. 15th, 20 2020 , and completed
all work processes in accordance with the planning schedule. The contract
was signed as amount of NT$ 4.36 million. The manpower is arranged
according to the contract requirement, as of project director, project
manager, engineers and on on-site representative.
Key accomplishments
are including, a total of 53 crosscross-departmental
inspections while joining environm environmen tal protection, police force, and motor
vehicles offices. A total of 40 prenoticeprenotice-to -check sessions. A total of 32 noise analysis and monitoring on civic complaint hotspots. Sor ts of traffic
noise monitoring cases were executed, including, total of 1 19 monitoring
cases on express highway, highway, and roads; total of 4 executed on
railways. A total of 50 measurements on non non-ionizing radiation tests. A
total of 2 environmental nois e i nspections was performed. Checks on noise
control center and monitoring station of Xinshe Airport and
ChingChing-ChuanChuan-Kang Air Force Base were completed in the 2nd quarter, 20202020. All performing instruments are verified and calibrated within the project
peri od.
|